Patent · US10774866B2 · B2 · US
Method of installing a steel stud anchor
- (11) Publication number
- US10774866B2
- (21) Application number
- 15/425,354
- (22) Filing date
- 2017-02-06
- (30) Priority date
- 2014-03-01
- (43) Publication date
- 2020-09-15
- (45) Date of grant
- 2020-09-15
- (51) IPC
- E04B 2/58; E04F 13/08; F16B 23/00; F16B 25/00; F16B 25/10
- (52) CPC
- F16B Devices for fastening or securing constructional elements or machine parts together, e.g. nails, bolts, circlips, clamps, clips or wedges; joints or jointing: 25/0021, 21/00, 23/0007, 25/00, 25/0031, 25/0042, 25/0057, 25/0073, 25/0078, 25/10, 25/103
- E04B General building constructions; walls, e.g. partitions; roofs; floors; ceilings; insulation or other protection of buildings: 2/58
- E04F Finishing work on buildings, e.g. stairs, floors: 13/0832
- Y10T Technical subjects covered by former us classification: 29/49963
- (72) Inventors
- Franklin Jiri CALL; Mark Robbeson
- (54) Title
- Method of installing a steel stud anchor
- (57) Abstract
A metal anchoring fastener fastens millwork onto walls constructed with wall cladding fastened to steel studs. The load typical of a loaded cabinet is borne by the steel stud anchors owing to the mate between the profile of the steel stud anchor and the layers of millwork and wall cladding and steel stud that said anchor penetrates. The pitch of the thread adorning the profile of the steel stud anchor progresses non-linearly along the length of said shaft, the shaft is generally non-linear in profile, and the thread profile is non-uniform along the length of said shaft. The anchor can also support a secondary screw concentrically penetrating the void at the center of the anchor, in order to hang loads from a wall, with or without millwork. Predrilling of the holes can enable installation of these zinc anchors.
- Full text
- View on Google Patents
Claims (30)
- A method of installing a steel stud anchor through a wall cladding and a steel stud to form a load-bearing mate comprising: (1) screwing the anchor through the wall cladding and then into the steel stud located behind the wall cladding; (2) forming a comma shaped opening in the steel stud as the anchor is screwed through the steel stud, such that the opening is wider at one end and is slightly elongated to one side at an opposing end; and (3) displacing the metal of the steel stud such that the displaced metal of the steel stud pushes through the opening and then bends back or curls onto the anchor to hold the anchor in place, wherein the anchor is comprised of a head, a shaft and a tip and has a threaded portion extending along a length of the shaft.
- The method of claim 1, wherein the threads extend in a non-linear pitch around the length of the shaft in a linear progression.
- The method of claim 1, wherein the shaft diameter has a non-linear progression along the length of the shaft, and wherein the threads extend in a non-linear pitch around the length of the shaft in a linear progression.
- The method of claim 1, wherein the shaft has a concave curved profile.
- The method of claim 1, wherein a pitch and a radius of the thread is defined by Formula I and Formula II as follows: Radius=((Zp/Lt) Pv ×(R max− R min))+ R min Formula I Pitch=((Zp/Lt)×(P max− P min))+ P min Formula II wherein Zp is a Position along the thread, Lt is a Length of the threaded section of the shaft, Rmax is a Maximum Radius of the thread measured from a centerline through the shaft at a head end of the anchor, Rmin is a Minimum Radius of the thread measured from a centerline through the shaft at a tip of the anchor, Pmax is a Maximum Pitch at the head end of the anchor, Pmin is a minimum Pitch at an end of the pointed tip of the anchor, Pv is a Power value.
- The method of claim 5, wherein is from about to 1.0″ to about 3.5″, Rmax is from about 0.125″ to about 0.375″, Rmin is from about 0.040″ to about 0.1875″, Pmax is from about 0.1875″ to about 0.625″, Pmin is from about to 0.040″ to about 0.1875″, and Pv is from about 1.0 to about 5.0.
- The method of claim 1, wherein the steel stud anchor is made of zinc or a zinc alloy.
- The method of claim 1, wherein step 1 further comprises driving the anchor into the wall cladding and into the steel stud during a first revolution of the threaded portion such that the only about ⅛″ of the anchor is in or has passed through the wall cladding and an adjacent portion of the anchor that has not yet entered or passed through the steel stud has a larger pitch than the ⅛″ of the anchor that has entered or passed through the steel stud, with the larger pitch acting as an auger as it enters the wall cladding, pushing debris from a perforation in the wall cladding out of the way for the anchor.
- The method of claim 1, wherein the comma shaped opening in the steel stud and the bending back or curling of the displaced metal of the steel stud onto the anchor as the anchor is screwed into the steel stud prevent the metal of the steel stud from jumping over the threaded portion of the shaft so the anchor does not strip.
- The method of claim 1, further comprising drilling a pilot hole before the steel stud anchor is threaded through the wall cladding and steel stud.
- The method of claim 1, wherein the shaft includes a blade for clearing away debris from the hole.
- A method of installing a steel stud anchor through a wall cladding and a steel stud to form a load-bearing mate comprising: (1) threading the anchor through the wall cladding to form a conical perforation in the wall cladding, said anchor being comprised of a head, a tip and a shaft having a threaded portion extending along a length of the shaft, with the shaft comprising an auger zone proximal to the tip, and a wedge zone distal to the tip; (2) threading the anchor into the steel stud located behind the wall cladding; (3) threading the auger zone of the anchor through the wall cladding such that the threads of the auger zone stretch the conical perforation in the wall cladding so that the threads act as an auger and push the debris out of the conical perforation in the wall cladding in a direction opposite from the steel stud; (4) continuing the threading of the anchor through the wall cladding and the steel stud until a portion of the wedge zone has passed through the steel stud and a second portion of the wedge zone is located within the steel stud.
- The method of claim 12, further comprising threading the anchor through the wall cladding and the steel stud until a top grooved zone on the shaft adjacent to the head sits within the wall cladding.
- The method of claim 12, further comprising displacing the metal of the steel stud such that the displaced metal of the steel stud pushes through the opening and then bends back onto the threads of the anchor around the anchor to help hold the anchor in place, with the bending back of displaced metal beginning as the auger zone is threaded through the steel stud and further comprising stopping the threading of the anchor when a portion of the wedge zone is located within the steel stud, wherein the threaded portion has a variable pitch extending from the wedge zone through the auger zone.
- The method of claim 12, wherein step 2 further comprises an increasing diameter of the shaft of the steel stud anchor pulling a hole in the steel stud open as the steel stud anchor is threaded through the steel stud, while the steel stud anchor thread also begins to tightly bend or curl the displaced metal of the steel stud around the anchor to form an increasing rim, allowing for increased surface area between the anchor and the steel stud to reinforce the holding of the anchor in the steel stud and secure fixation of the steel stud anchor in the steel stud.
- The method of claim 12, wherein a pitch and a radius of the thread is defined by Formula I and Formula II as follows: Radius=((Zp/Lt) Pv ×(R max− R min))+ R min Formula I Pitch=((Zp/Lt)×(P max− P min))+ P min Formula II wherein Zp is a Position along the thread, Lt is a Length of the threaded section of the shaft, Rmax is a Maximum Radius of the thread measured from a centerline through the shaft at a head end of the anchor, Rmin is a Minimum Radius of the thread measured from a centerline through the shaft at a tip of the anchor, Pmax is a Maximum Pitch at the head end of the anchor, Pmin is a minimum Pitch at an end of the pointed tip of the anchor, Pv is a Power value.
- The method of claim 5, wherein Lt is from about to 1.0″ to about 3.5″, Rmax is from about 0.125″ to about 0.375″, Rmin is from about 0.040″ to about 0.1875″, Pmax is from about 0.1875″ to about 0.625″, Pmin is from about to 0.040″ to about 0.1875″, and Pv is from about 1.0 to about 5.0.
- The method of claim 12, wherein the steel stud anchor is made of zinc or a zinc alloy.
- The method of claim 12, wherein the shaft diameter has a non-linear progression along the length of the shaft, and wherein the thread extends in a non-linear pitch around the length of the shaft in a linear progression.
- The method of claim 12, further comprising drilling a pilot hole before the steel stud anchor is threaded through the wall cladding and steel stud.
- A method of installing a metal fastener in a steel stud to form a load-bearing mate comprising: (1) threading the fastener into the steel stud, said fastener having a head, a conically shaped shaft and a pointed tip, with the shaft extending from the head to the pointed tip and having a top grooved zone adjacent to the head and a threaded portion adjacent to the grooved zone and extending to the pointed tip, said threaded portion having an auger zone proximal to the pointed tip and a wedge zone distal to the tip, wherein the shaft diameter has a non-linear progression along the length of the shaft, and wherein the threads extend in a non-linear pitch around the length of the shaft in a linear progression and wherein the head has a central void including a screw drive, wherein the central void extends into the shaft; (2) continuing to thread the fastener through the steel stud until at least a portion of the wedge zone resides within the steel stud.
- The method of claim 21, wherein a pitch and a radius of the thread is defined by Formula I and Formula II as follows: Radius=((Zp/Lt) Pv ×(R max− R min))+ R min Formula I Pitch=((Zp/Lt)×(P max− P min))+ P min Formula II wherein Zp is a Position along the thread, Lt is a Length of the threaded section of the shaft, Rmax is a Maximum Radius of the thread measured from a centerline through the shaft at a head end of the metal fastener, Rmin is a Minimum Radius of the thread measured from a centerline through the shaft at a tip of the metal fastener, Pmax is a Maximum Pitch at the head end of the metal fastener, Pmin is a minimum Pitch at an end of the pointed tip of the metal fastener, Pv is a Power value.
- The method of claim 5, wherein Lt is from about to 1.0″ to about 3.5″, Rmax is from about 0.125″ to about 0.375″, Rmin is from about 0.040″ to about 0.1875″, Pmax is from about 0.1875″ to about 0.625″, Pmin is from about to 0.040″ to about 0.1875″, and Pv is from about 1.0 to about 5.0.
- The method of claim 21, wherein the metal fastener is made of zinc or a zinc alloy.
- The method of claim 21, wherein the maximum thread height occurs adjacent to the top grooved zone and the maximum thread height is about 3/16″ and wherein the minimum thread height occurs in the top grooved zone adjacent to the head of the metal fastener and is about 1/16″.
- The method of claim 21, wherein the anchor is concentrically penetrated by a generally conical cavity partly extruding into the shaft from the head of the fastener, said conical central void extending approximately 1″ from the head into the shaft such that the conical central void extends through about 28% of the length of the shaft, with the remaining about 72% of the shaft being solid.
- The method of claim 21, wherein the shaft has a concave profile.
- The method of claim 21, further comprising screwing the auger zone of the threaded portion of the shaft through the wall cladding such that the threads of the auger zone stretch a conical perforation in the wall cladding so that the threads act as an auger and push the debris out of the conical perforation in the wall cladding in a direction opposite from the steel stud.
- A method of installing a metal fastener in a steel stud to form a load-bearing mate comprising: a) threading the fastener into the steel stud wherein the fastener comprises: a fastener head equipped with tightening features around a central void a threaded, generally conical shaft with curved sides in cross-section that meet at a tip, a linear progression in thread pitch along the length of the shaft, a thread profile that changes with position along the thread, a non-linear progression of shaft diameter along the length of the shaft, a piercing point at the distal end of the generally conical shaft, and wherein the threaded shaft has an auger zone proximal to the tip having threads for stretching a hole in the steel stud and for pushing debris out of the way as the fastener is inserted through the steel stud and has a wedge zone proximal to the auger zone for further enlarging ft the hole in the steel stud and having threads for forming an increasing rim around the hole in the steel stud formed from the steel stud material to wedge the anchor in the steel stud and prevent it from jumping over threads of the threaded shaft so it does not strip the steel stud anchor; b) continuing to thread the fastener through the steel stud until the auger zone has passed through the hole in the steel stud and at least a portion of the wedge zone resides within the steel stud.
- A method of installing a metal steel stud anchor in a steel stud to form a load-bearing mate comprising a) threading the anchor through a wall comprising drywall into the steel stud, wherein the anchor comprises a head, a shaft and a pointed tip and wherein the shaft is conically shaped and extends from the head to the pointed tip, with the shaft having a top grooved zone adjacent to the head and a threaded portion adjacent to the grooved zone and extending to the pointed tip, wherein the shaft diameter has a non-linear progression along the length of the shaft, and wherein the threads extend in a non-linear pitch around the length of the shaft in a linear progression and wherein the head has a central void, wherein the central void extends into the shaft and wherein the shaft has a concave profile b) continuing to thread the anchor through the wall and the steel stud until the head is flush with an outer surface of the wall.
Description
This application is a continuation of U.S. application Ser. No. 14/632,966, filed Feb. 26, 2015, which is a continuation in part of U.S. patent application Ser. No. 14/194,679, filed Mar. 1, 2014, the disclosures of which are hereby incorporated by reference in their entirety.
This Invention relates generally to fasteners and more particularly to fasteners detailed to anchor in steel studs supporting walls in buildings.
For generations, homes were framed with timber, with the interiors clad in drywall or some sort of wallboard. In a traditional wood-framed home, hanging things from the walls was neither difficult nor precarious. Mainly 2″×4″s and 2″×6″s were used. After the framing was finished, drywall or some wall board surface would be attached to the framing members, it would be painted and then the millwork would be attached, such as a kitchen cabinet, a bathroom vanity, book cases etc. These solid wooden studs were sturdy and the process, although wasteful, allowed builders and homeowners alike to easily fasten millwork and other heavy objects to walls by using a wood screw to connect the millwork to the structural timber framing members of the home. The solid wood stud provided plenty of surface contact to a fastener or wood screw and plenty of tensile strength to hold the fastener or wood screw in place and support the weight of e.g. cabinets and shelves being fastened to the walls. The use of a solid wood stud and a properly sized wood screw remains the preferred and usual method to install carpentry and millwork.
Citations (18)
- US3221588A
- US3752030A
- US4241638A
- US4693654A
- US4473984A
- US4653244A
- WO1999005420A1
- US6419436B1
- US6406233B1
- US20050079027A1
- US20060018730A1
- US20060228186A1
- US20080014047A1
- US20070292235A1
- US20090136319A1
- US8601763B2
- US8904622B2
- WO2014026051A1
Record as JSON
{
"publication_number": "US10774866B2",
"country": "US",
"kind": "B2",
"title": "Method of installing a steel stud anchor",
"abstract": "A metal anchoring fastener fastens millwork onto walls constructed with wall cladding fastened to steel studs. The load typical of a loaded cabinet is borne by the steel stud anchors owing to the mate between the profile of the steel stud anchor and the layers of millwork and wall cladding and steel stud that said anchor penetrates. The pitch of the thread adorning the profile of the steel stud anchor progresses non-linearly along the length of said shaft, the shaft is generally non-linear in profile, and the thread profile is non-uniform along the length of said shaft. The anchor can also support a secondary screw concentrically penetrating the void at the center of the anchor, in order to hang loads from a wall, with or without millwork. Predrilling of the holes can enable installation of these zinc anchors.",
"claims": [
"1. A method of installing a steel stud anchor through a wall cladding and a steel stud to form a load-bearing mate comprising: (1) screwing the anchor through the wall cladding and then into the steel stud located behind the wall cladding; (2) forming a comma shaped opening in the steel stud as the anchor is screwed through the steel stud, such that the opening is wider at one end and is slightly elongated to one side at an opposing end; and (3) displacing the metal of the steel stud such that the displaced metal of the steel stud pushes through the opening and then bends back or curls onto the anchor to hold the anchor in place, wherein the anchor is comprised of a head, a shaft and a tip and has a threaded portion extending along a length of the shaft.",
"2. The method of claim 1, wherein the threads extend in a non-linear pitch around the length of the shaft in a linear progression.",
"3. The method of claim 1, wherein the shaft diameter has a non-linear progression along the length of the shaft, and wherein the threads extend in a non-linear pitch around the length of the shaft in a linear progression.",
"4. The method of claim 1, wherein the shaft has a concave curved profile.",
"5. The method of claim 1, wherein a pitch and a radius of the thread is defined by Formula I and Formula II as follows: Radius=((Zp/Lt) Pv ×(R max− R min))+ R min Formula I Pitch=((Zp/Lt)×(P max− P min))+ P min Formula II wherein Zp is a Position along the thread, Lt is a Length of the threaded section of the shaft, Rmax is a Maximum Radius of the thread measured from a centerline through the shaft at a head end of the anchor, Rmin is a Minimum Radius of the thread measured from a centerline through the shaft at a tip of the anchor, Pmax is a Maximum Pitch at the head end of the anchor, Pmin is a minimum Pitch at an end of the pointed tip of the anchor, Pv is a Power value.",
"6. The method of claim 5, wherein is from about to 1.0″ to about 3.5″, Rmax is from about 0.125″ to about 0.375″, Rmin is from about 0.040″ to about 0.1875″, Pmax is from about 0.1875″ to about 0.625″, Pmin is from about to 0.040″ to about 0.1875″, and Pv is from about 1.0 to about 5.0.",
"7. The method of claim 1, wherein the steel stud anchor is made of zinc or a zinc alloy.",
"8. The method of claim 1, wherein step 1 further comprises driving the anchor into the wall cladding and into the steel stud during a first revolution of the threaded portion such that the only about ⅛″ of the anchor is in or has passed through the wall cladding and an adjacent portion of the anchor that has not yet entered or passed through the steel stud has a larger pitch than the ⅛″ of the anchor that has entered or passed through the steel stud, with the larger pitch acting as an auger as it enters the wall cladding, pushing debris from a perforation in the wall cladding out of the way for the anchor.",
"9. The method of claim 1, wherein the comma shaped opening in the steel stud and the bending back or curling of the displaced metal of the steel stud onto the anchor as the anchor is screwed into the steel stud prevent the metal of the steel stud from jumping over the threaded portion of the shaft so the anchor does not strip.",
"10. The method of claim 1, further comprising drilling a pilot hole before the steel stud anchor is threaded through the wall cladding and steel stud.",
"11. The method of claim 1, wherein the shaft includes a blade for clearing away debris from the hole.",
"12. A method of installing a steel stud anchor through a wall cladding and a steel stud to form a load-bearing mate comprising: (1) threading the anchor through the wall cladding to form a conical perforation in the wall cladding, said anchor being comprised of a head, a tip and a shaft having a threaded portion extending along a length of the shaft, with the shaft comprising an auger zone proximal to the tip, and a wedge zone distal to the tip; (2) threading the anchor into the steel stud located behind the wall cladding; (3) threading the auger zone of the anchor through the wall cladding such that the threads of the auger zone stretch the conical perforation in the wall cladding so that the threads act as an auger and push the debris out of the conical perforation in the wall cladding in a direction opposite from the steel stud; (4) continuing the threading of the anchor through the wall cladding and the steel stud until a portion of the wedge zone has passed through the steel stud and a second portion of the wedge zone is located within the steel stud.",
"13. The method of claim 12, further comprising threading the anchor through the wall cladding and the steel stud until a top grooved zone on the shaft adjacent to the head sits within the wall cladding.",
"14. The method of claim 12, further comprising displacing the metal of the steel stud such that the displaced metal of the steel stud pushes through the opening and then bends back onto the threads of the anchor around the anchor to help hold the anchor in place, with the bending back of displaced metal beginning as the auger zone is threaded through the steel stud and further comprising stopping the threading of the anchor when a portion of the wedge zone is located within the steel stud, wherein the threaded portion has a variable pitch extending from the wedge zone through the auger zone.",
"15. The method of claim 12, wherein step 2 further comprises an increasing diameter of the shaft of the steel stud anchor pulling a hole in the steel stud open as the steel stud anchor is threaded through the steel stud, while the steel stud anchor thread also begins to tightly bend or curl the displaced metal of the steel stud around the anchor to form an increasing rim, allowing for increased surface area between the anchor and the steel stud to reinforce the holding of the anchor in the steel stud and secure fixation of the steel stud anchor in the steel stud.",
"16. The method of claim 12, wherein a pitch and a radius of the thread is defined by Formula I and Formula II as follows: Radius=((Zp/Lt) Pv ×(R max− R min))+ R min Formula I Pitch=((Zp/Lt)×(P max− P min))+ P min Formula II wherein Zp is a Position along the thread, Lt is a Length of the threaded section of the shaft, Rmax is a Maximum Radius of the thread measured from a centerline through the shaft at a head end of the anchor, Rmin is a Minimum Radius of the thread measured from a centerline through the shaft at a tip of the anchor, Pmax is a Maximum Pitch at the head end of the anchor, Pmin is a minimum Pitch at an end of the pointed tip of the anchor, Pv is a Power value.",
"17. The method of claim 5, wherein Lt is from about to 1.0″ to about 3.5″, Rmax is from about 0.125″ to about 0.375″, Rmin is from about 0.040″ to about 0.1875″, Pmax is from about 0.1875″ to about 0.625″, Pmin is from about to 0.040″ to about 0.1875″, and Pv is from about 1.0 to about 5.0.",
"18. The method of claim 12, wherein the steel stud anchor is made of zinc or a zinc alloy.",
"19. The method of claim 12, wherein the shaft diameter has a non-linear progression along the length of the shaft, and wherein the thread extends in a non-linear pitch around the length of the shaft in a linear progression.",
"20. The method of claim 12, further comprising drilling a pilot hole before the steel stud anchor is threaded through the wall cladding and steel stud.",
"21. A method of installing a metal fastener in a steel stud to form a load-bearing mate comprising: (1) threading the fastener into the steel stud, said fastener having a head, a conically shaped shaft and a pointed tip, with the shaft extending from the head to the pointed tip and having a top grooved zone adjacent to the head and a threaded portion adjacent to the grooved zone and extending to the pointed tip, said threaded portion having an auger zone proximal to the pointed tip and a wedge zone distal to the tip, wherein the shaft diameter has a non-linear progression along the length of the shaft, and wherein the threads extend in a non-linear pitch around the length of the shaft in a linear progression and wherein the head has a central void including a screw drive, wherein the central void extends into the shaft; (2) continuing to thread the fastener through the steel stud until at least a portion of the wedge zone resides within the steel stud.",
"22. The method of claim 21, wherein a pitch and a radius of the thread is defined by Formula I and Formula II as follows: Radius=((Zp/Lt) Pv ×(R max− R min))+ R min Formula I Pitch=((Zp/Lt)×(P max− P min))+ P min Formula II wherein Zp is a Position along the thread, Lt is a Length of the threaded section of the shaft, Rmax is a Maximum Radius of the thread measured from a centerline through the shaft at a head end of the metal fastener, Rmin is a Minimum Radius of the thread measured from a centerline through the shaft at a tip of the metal fastener, Pmax is a Maximum Pitch at the head end of the metal fastener, Pmin is a minimum Pitch at an end of the pointed tip of the metal fastener, Pv is a Power value.",
"23. The method of claim 5, wherein Lt is from about to 1.0″ to about 3.5″, Rmax is from about 0.125″ to about 0.375″, Rmin is from about 0.040″ to about 0.1875″, Pmax is from about 0.1875″ to about 0.625″, Pmin is from about to 0.040″ to about 0.1875″, and Pv is from about 1.0 to about 5.0.",
"24. The method of claim 21, wherein the metal fastener is made of zinc or a zinc alloy.",
"25. The method of claim 21, wherein the maximum thread height occurs adjacent to the top grooved zone and the maximum thread height is about 3/16″ and wherein the minimum thread height occurs in the top grooved zone adjacent to the head of the metal fastener and is about 1/16″.",
"26. The method of claim 21, wherein the anchor is concentrically penetrated by a generally conical cavity partly extruding into the shaft from the head of the fastener, said conical central void extending approximately 1″ from the head into the shaft such that the conical central void extends through about 28% of the length of the shaft, with the remaining about 72% of the shaft being solid.",
"27. The method of claim 21, wherein the shaft has a concave profile.",
"28. The method of claim 21, further comprising screwing the auger zone of the threaded portion of the shaft through the wall cladding such that the threads of the auger zone stretch a conical perforation in the wall cladding so that the threads act as an auger and push the debris out of the conical perforation in the wall cladding in a direction opposite from the steel stud.",
"29. A method of installing a metal fastener in a steel stud to form a load-bearing mate comprising: a) threading the fastener into the steel stud wherein the fastener comprises: a fastener head equipped with tightening features around a central void a threaded, generally conical shaft with curved sides in cross-section that meet at a tip, a linear progression in thread pitch along the length of the shaft, a thread profile that changes with position along the thread, a non-linear progression of shaft diameter along the length of the shaft, a piercing point at the distal end of the generally conical shaft, and wherein the threaded shaft has an auger zone proximal to the tip having threads for stretching a hole in the steel stud and for pushing debris out of the way as the fastener is inserted through the steel stud and has a wedge zone proximal to the auger zone for further enlarging ft the hole in the steel stud and having threads for forming an increasing rim around the hole in the steel stud formed from the steel stud material to wedge the anchor in the steel stud and prevent it from jumping over threads of the threaded shaft so it does not strip the steel stud anchor; b) continuing to thread the fastener through the steel stud until the auger zone has passed through the hole in the steel stud and at least a portion of the wedge zone resides within the steel stud.",
"30. A method of installing a metal steel stud anchor in a steel stud to form a load-bearing mate comprising a) threading the anchor through a wall comprising drywall into the steel stud, wherein the anchor comprises a head, a shaft and a pointed tip and wherein the shaft is conically shaped and extends from the head to the pointed tip, with the shaft having a top grooved zone adjacent to the head and a threaded portion adjacent to the grooved zone and extending to the pointed tip, wherein the shaft diameter has a non-linear progression along the length of the shaft, and wherein the threads extend in a non-linear pitch around the length of the shaft in a linear progression and wherein the head has a central void, wherein the central void extends into the shaft and wherein the shaft has a concave profile b) continuing to thread the anchor through the wall and the steel stud until the head is flush with an outer surface of the wall."
],
"description_excerpt": "This application is a continuation of U.S. application Ser. No. 14/632,966, filed Feb. 26, 2015, which is a continuation in part of U.S. patent application Ser. No. 14/194,679, filed Mar. 1, 2014, the disclosures of which are hereby incorporated by reference in their entirety.\n\nThis Invention relates generally to fasteners and more particularly to fasteners detailed to anchor in steel studs supporting walls in buildings.\n\nFor generations, homes were framed with timber, with the interiors clad in drywall or some sort of wallboard. In a traditional wood-framed home, hanging things from the walls was neither difficult nor precarious. Mainly 2″×4″s and 2″×6″s were used. After the framing was finished, drywall or some wall board surface would be attached to the framing members, it would be painted and then the millwork would be attached, such as a kitchen cabinet, a bathroom vanity, book cases etc. These solid wooden studs were sturdy and the process, although wasteful, allowed builders and homeowners alike to easily fasten millwork and other heavy objects to walls by using a wood screw to connect the millwork to the structural timber framing members of the home. The solid wood stud provided plenty of surface contact to a fastener or wood screw and plenty of tensile strength to hold the fastener or wood screw in place and support the weight of e.g. cabinets and shelves being fastened to the walls. The use of a solid wood stud and a properly sized wood screw remains the preferred and usual method to install carpentry and millwork.",
"cpc": [
"F16B 25/0021",
"E04B 2/58",
"E04F 13/0832",
"F16B 21/00",
"F16B 23/0007",
"F16B 25/00",
"F16B 25/0031",
"F16B 25/0042",
"F16B 25/0057",
"F16B 25/0073",
"F16B 25/0078",
"F16B 25/10",
"F16B 25/103",
"Y10T 29/49963"
],
"ipc": [
"E04B 2/58",
"E04F 13/08",
"F16B 23/00",
"F16B 25/00",
"F16B 25/10"
],
"inventors": [
"Franklin Jiri CALL",
"Mark Robbeson"
],
"filing_date": "2017-02-06",
"publication_date": "2020-09-15",
"grant_date": "2020-09-15",
"priority_date": "2014-03-01",
"application_number": "US-201715425354-A",
"family_id": "54006578",
"cited_by_count": 0,
"citations": [
"US3221588A",
"US3752030A",
"US4241638A",
"US4693654A",
"US4473984A",
"US4653244A",
"WO1999005420A1",
"US6419436B1",
"US6406233B1",
"US20050079027A1",
"US20060018730A1",
"US20060228186A1",
"US20080014047A1",
"US20070292235A1",
"US20090136319A1",
"US8601763B2",
"US8904622B2",
"WO2014026051A1"
]
}