MLchartDataset catalogue

Net summer capacity

Term · Energy · MLC-T-ENE-001437

The maximum output, commonly expressed in megawatts (MW), that generating equipment can supply to system load, as demonstrated by a multi-hour test, at the time of summer peak demand (period of June 1 through September 30.) This output reflects a reduction in capacity due to electricity use for station service or auxiliaries.

Table 1. Record
IdentifierMLC-T-ENE-001437
FieldEnergy
SubjectElectricity
ReferencesEIA Glossary