MLchartDataset catalogue

Bring up

Term · Industrial and trades · MLC-T-IND-000776

To initiate and configure a new electronic system or component to a functional state after assembly or installation. This process involves powering on the device, loading initial firmware, performing basic tests, and verifying that all subsystems operate as intended. It is a systematic procedure to transition hardware from a non-operational state to readiness for further development or deployment.

Table 1. Record
IdentifierMLC-T-IND-000776
FieldIndustrial and trades
SubjectIndustrial electronics
TranslationsGerman: Abnahmeprüfung; Spanish: arrancar; French: mettre en service