Delay assignment (DAS)
Term · Aviation and air traffic control · MLC-T-AVN-000309
Delays are distributed to aircraft based on the traffic management program parameters. The delay assignment is calculated in 15-minute increments and appears as a table in Traffic Flow Management System (TFMS).
| Identifier | MLC-T-AVN-000309 |
|---|---|
| Field | Aviation and air traffic control |
| Abbreviation | DAS |
| References | FAA Pilot/Controller Glossary |