Capital cost
Term · Energy · MLC-T-ENE-000223
The cost of field development and plant construction and the equipment required for industry operations.
| Identifier | MLC-T-ENE-000223 |
|---|---|
| Field | Energy |
| References | EIA Glossary |
Term · Energy · MLC-T-ENE-000223
The cost of field development and plant construction and the equipment required for industry operations.
| Identifier | MLC-T-ENE-000223 |
|---|---|
| Field | Energy |
| References | EIA Glossary |