Construction costs (of the electric power industry)

Term · Energy · MLC-T-ENE-000395

All direct and indirect costs incurred in acquiring and constructing electric utility plant and equipment and proportionate shares of common utility plants. Included are the cost of land and improvements, nuclear fuel and spare parts, allowance for funds used during construction, and general overheads capitalized, less the cost of acquiring plant and equipment previously operated in utility service.

Table 1. Record
IdentifierMLC-T-ENE-000395
FieldEnergy
ReferencesEIA Glossary
Record as JSON
{
  "id": "MLC-T-ENE-000395",
  "term": "Construction costs (of the electric power industry)",
  "field": "Energy",
  "definition": "All direct and indirect costs incurred in acquiring and constructing electric utility plant and equipment and proportionate shares of common utility plants. Included are the cost of land and improvements, nuclear fuel and spare parts, allowance for funds used during construction, and general overheads capitalized, less the cost of acquiring plant and equipment previously operated in utility service.",
  "references": [
    "EIA Glossary"
  ],
  "url": "https://mlchart.com/terminology/energy/construction-costs-of-the-electric-power-industry/"
}

Record 395 of 2,515 in Energy terminology (MLC-0117). Request the full dataset.