Low power testing
Term · Energy · MLC-T-ENE-001227
The period of time between a plant's nuclear generating unit's initial fuel loading date and the issuance of its operating (full-power) license. The maximum level of operation during this period is 5 percent of the unit's thermal rating.
| Identifier | MLC-T-ENE-001227 |
|---|---|
| Field | Energy |
| References | EIA Glossary |