Power ascension
Term · Energy · MLC-T-ENE-001730
The period of time between a plant's initial fuel loading date and its date of first commercial operation (including the low-power testing period). Plants in the first operating cycle (the time from initial fuel loading to the first refueling), which lasts approximately 2 years, operate at an average capacity factor of about 40 percent.
| Identifier | MLC-T-ENE-001730 |
|---|---|
| Field | Energy |
| References | EIA Glossary |
Record as JSON
{
"id": "MLC-T-ENE-001730",
"term": "Power ascension",
"field": "Energy",
"definition": "The period of time between a plant's initial fuel loading date and its date of first commercial operation (including the low-power testing period). Plants in the first operating cycle (the time from initial fuel loading to the first refueling), which lasts approximately 2 years, operate at an average capacity factor of about 40 percent.",
"references": [
"EIA Glossary"
],
"url": "https://mlchart.com/terminology/energy/power-ascension/"
}
Record 1,722 of 2,500 in Energy terminology (MLC-0117). Request the full dataset.