Area contingency plan
Term · Environment · MLC-T-ENV-002066
1. Provided for by CWA sections 311(a)(19) and (j)(4), means the plan prepared by an Area Committee that is developed to be implemented in conjunction with the NCP and RCP, in part to address removal of a worst case discharge and to mitigate or prevent a substantial threat of such a discharge from a vessel, offshore facility, or onshore facility operating in or near an area designated by the President.
2. As defined by CWA sections 311(a)(19) and (j)(4) means the plan prepared by an Area Committee that is developed to be implemented in conjunction with the NCP and RCP, in part to address removal of a worst case discharge and to mitigate or prevent a substantial threat of such a discharge from a vessel, offshore facility, or onshore facility operating in or near an area designated by the President.
| Identifier | MLC-T-ENV-002066 |
|---|---|
| Field | Environment |
| Subject | Environmental events |
| Abbreviation | ACP |
| References | 40 CFR 300.5 (CFR 2013); 40 CFR Appendix E to Part 300 (CFR 2013) |