MLchartDataset catalogue

Collection and Control System Design Plan

Term · Environment · MLC-T-ENV-005585

Plan that describes the collection and control system that will capture the gas generated within an MSW landfill. The collection and control system design plan must be prepared by a professional engineer and must describe a collection and control system that meets the requirements of 40 CFR 60.752(b)(2)(ii). The final control plan must contain engineering specifications and drawings of the collection and control system. The final control plan must include any alternatives to the operational standards, test methods, procedures, compliance measures, monitoring, recordkeeping or reporting provisions of 40 CFR 60.753 through 60.758 proposed by the owner or operator. The final control plan must either conform with the specifications for active collection systems in 40 CFR 60.759 or include a demonstration that shows that based on the size of the landfill and the amount of waste expected to be accepted, the system is sized properly to collect the gas, control emissions of NMOC to the required level and meet the operational standards for a landfill.

Table 1. Record
IdentifierMLC-T-ENV-005585
FieldEnvironment
References40 CFR 62.14351 (CFR 2018)
Record as JSON
{
  "id": "MLC-T-ENV-005585",
  "term": "Collection and Control System Design Plan",
  "field": "Environment",
  "definition": "Plan that describes the collection and control system that will capture the gas generated within an MSW landfill. The collection and control system design plan must be prepared by a professional engineer and must describe a collection and control system that meets the requirements of 40 CFR 60.752(b)(2)(ii). The final control plan must contain engineering specifications and drawings of the collection and control system. The final control plan must include any alternatives to the operational standards, test methods, procedures, compliance measures, monitoring, recordkeeping or reporting provisions of 40 CFR 60.753 through 60.758 proposed by the owner or operator. The final control plan must either conform with the specifications for active collection systems in 40 CFR 60.759 or include a demonstration that shows that based on the size of the landfill and the amount of waste expected to be accepted, the system is sized properly to collect the gas, control emissions of NMOC to the required level and meet the operational standards for a landfill.",
  "references": [
    "40 CFR 62.14351 (CFR 2018)"
  ],
  "url": "https://mlchart.com/terminology/environment/collection-and-control-system-design-plan/"
}

Record 5,585 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.