Commence unit operation
Term · Environment · MLC-T-ENV-005698
1. To have begun any mechanical, chemical, or electronic process, including start-up of an emissions control technology or emissions monitor or of a unit's combustion chamber.
2. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit's combustion chamber. Except as provided in § 97.4(b), § 97.5, or subpart I of this part for a unit that is a NOX Budget unit under § 97.4(a) on the date of commencement of operation, such date shall remain the unit's date of commencement of operation even if the unit is subsequently modified, reconstructed, or repowered. Except as provided in § 97.4(b), § 97.5, or subpart I of this part, for a unit that is not a NOX Budget unit under § 97.4(a) on the date of commencement of operation, the date the unit becomes a NOX Budget unit under § 97.4(a) shall be the unit's date of commencement of operation.
3. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit's combustion chamber, except as provided in § 97.184(h).(2) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit.(3) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit's date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1), (2), or (3) of this definition as appropriate, except as provided in § 97.184(h).
4. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit's combustion chamber, except as provided in § 97.284(h).(2) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit.(3) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit's date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1), (2), or (3) of this definition as appropriate, except as provided in § 97.284(h).
5. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit's combustion chamber, except as provided in § 97.384(h).(i) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit.(ii) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit's date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1) or (2) of this definition as appropriate, except as provided in § 97.384(h). (2) Notwithstanding paragraph (1) of this definition and solely for purposes of subpart HHHH of this part, for a unit that is not a CAIR NOX Ozone Season unit under § 97.304(d) on the later of November 15, 1990 or the date the unit commences operation as defined in paragraph (1) of this definition and subsequently becomes such a CAIR NOX Ozone Season unit, the unit's date for commencement of operation shall be the date on which the unit becomes a CAIR NOX Ozone Season unit under § 97.304(d).(i) For a unit with a date for commencement of operation as defined in paragraph (2) of this definition and that subsequently undergoes a physical change (other than replacement of the unit by a unit at the same source), such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit.(ii) For a unit with a date for commencement of operation as defined in paragraph
6. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit’s combustion chamber. Except as provided in §96.5, for a unit that is a NOX Budget unit under §96.4 on the date of commencement of operation, such date shall remain the unit’s date of commencement of operation even if the unit is subsequently modified, reconstructed, or repowered. Except as provided in §96.5 or subpart I of this part, for a unit that is not a NOX Budget unit under §96.4 on the date of commencement of operation, the date the unit becomes a NOX Budget unit under §96.4 shall be the unit’s date of commencement of operation.
7. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit’s combustion chamber, except as provided in §96.184(h). (2) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit. (3) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit’s date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1), (2), or (3) of this definition as appropriate, except as provided in §96.184(h).
8. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit’s combustion chamber, except as provided in §96.284(h). (2) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit. (3) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit’s date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1), (2), or (3) of this definition as appropriate, except as provided in (96.284(h).
9. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit’s combustion chamber, except as provided in §96.384(h). (2) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit. (3) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit’s date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1), (2), or (3) of this definition as appropriate, except as provided in §96.384(h).
| Identifier | MLC-T-ENV-005698 |
|---|---|
| Field | Environment |
| Subject | Built environments |
| References | 40 CFR 72.2 (CFR 2013); 40 CFR 97.2 (CFR 2013); 40 CFR 97.102 (CFR 2013); 40 CFR 97.202 (CFR 2013); Definition Truncated; See 40 CFR 97.302 (CFR 2013); 40 CFR 96.2 (CFR 2018); 40 CFR 96.102 (CFR 2018); 40 CFR 96.202 (CFR 2018); 40 CFR 96.302 (CFR 2018) |
Record as JSON
{
"id": "MLC-T-ENV-005698",
"term": "Commence unit operation",
"field": "Environment",
"term_source": "Commence Unit Operation",
"definition": "1. To have begun any mechanical, chemical, or electronic process, including start-up of an emissions control technology or emissions monitor or of a unit's combustion chamber.\n\n2. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit's combustion chamber. Except as provided in § 97.4(b), § 97.5, or subpart I of this part for a unit that is a NOX Budget unit under § 97.4(a) on the date of commencement of operation, such date shall remain the unit's date of commencement of operation even if the unit is subsequently modified, reconstructed, or repowered. Except as provided in § 97.4(b), § 97.5, or subpart I of this part, for a unit that is not a NOX Budget unit under § 97.4(a) on the date of commencement of operation, the date the unit becomes a NOX Budget unit under § 97.4(a) shall be the unit's date of commencement of operation.\n\n3. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit's combustion chamber, except as provided in § 97.184(h).(2) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit.(3) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit's date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1), (2), or (3) of this definition as appropriate, except as provided in § 97.184(h).\n\n4. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit's combustion chamber, except as provided in § 97.284(h).(2) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit.(3) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit's date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1), (2), or (3) of this definition as appropriate, except as provided in § 97.284(h).\n\n5. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit's combustion chamber, except as provided in § 97.384(h).(i) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit.(ii) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit's date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1) or (2) of this definition as appropriate, except as provided in § 97.384(h). (2) Notwithstanding paragraph (1) of this definition and solely for purposes of subpart HHHH of this part, for a unit that is not a CAIR NOX Ozone Season unit under § 97.304(d) on the later of November 15, 1990 or the date the unit commences operation as defined in paragraph (1) of this definition and subsequently becomes such a CAIR NOX Ozone Season unit, the unit's date for commencement of operation shall be the date on which the unit becomes a CAIR NOX Ozone Season unit under § 97.304(d).(i) For a unit with a date for commencement of operation as defined in paragraph (2) of this definition and that subsequently undergoes a physical change (other than replacement of the unit by a unit at the same source), such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit.(ii) For a unit with a date for commencement of operation as defined in paragraph\n\n6. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit’s combustion chamber. Except as provided in §96.5, for a unit that is a NOX Budget unit under §96.4 on the date of commencement of operation, such date shall remain the unit’s date of commencement of operation even if the unit is subsequently modified, reconstructed, or repowered. Except as provided in §96.5 or subpart I of this part, for a unit that is not a NOX Budget unit under §96.4 on the date of commencement of operation, the date the unit becomes a NOX Budget unit under §96.4 shall be the unit’s date of commencement of operation.\n\n7. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit’s combustion chamber, except as provided in §96.184(h). (2) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit. (3) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit’s date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1), (2), or (3) of this definition as appropriate, except as provided in §96.184(h).\n\n8. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit’s combustion chamber, except as provided in §96.284(h). (2) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit. (3) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit’s date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1), (2), or (3) of this definition as appropriate, except as provided in (96.284(h).\n\n9. To have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit’s combustion chamber, except as provided in §96.384(h). (2) For a unit that undergoes a physical change (other than replacement of the unit by a unit at the same source) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the date of commencement of operation of the unit, which shall continue to be treated as the same unit. (3) For a unit that is replaced by a unit at the same source (e.g., repowered) after the date the unit commences operation as defined in paragraph (1) of this definition, such date shall remain the replaced unit’s date of commencement of operation, and the replacement unit shall be treated as a separate unit with a separate date for commencement of operation as defined in paragraph (1), (2), or (3) of this definition as appropriate, except as provided in §96.384(h).",
"subject": "Built environments",
"references": [
"40 CFR 72.2 (CFR 2013)",
"40 CFR 97.2 (CFR 2013)",
"40 CFR 97.102 (CFR 2013)",
"40 CFR 97.202 (CFR 2013)",
"Definition Truncated; See 40 CFR 97.302 (CFR 2013)",
"40 CFR 96.2 (CFR 2018)",
"40 CFR 96.102 (CFR 2018)",
"40 CFR 96.202 (CFR 2018)",
"40 CFR 96.302 (CFR 2018)"
],
"url": "https://mlchart.com/terminology/environment/commence-unit-operation/"
}
Record 5,572 of 29,894 in Environment terminology (MLC-0121). Request the full dataset.