Crusher Rated Capacity
Term · Environment · MLC-T-ENV-007004
Rated capacity in tons per hour of a crusher, grinding mill, bucket elevator, bagging operation, or enclosed truck or railcar loading station; the total surface area of the top screen of a screening operation; the width of a conveyor belt; and the rated capacity in tons of a storage bin.
| Identifier | MLC-T-ENV-007004 |
|---|---|
| Field | Environment |
| References | 40 CFR 60.671 (CFR 2013) |
Record as JSON
{
"id": "MLC-T-ENV-007004",
"term": "Crusher Rated Capacity",
"field": "Environment",
"definition": "Rated capacity in tons per hour of a crusher, grinding mill, bucket elevator, bagging operation, or enclosed truck or railcar loading station; the total surface area of the top screen of a screening operation; the width of a conveyor belt; and the rated capacity in tons of a storage bin.",
"references": [
"40 CFR 60.671 (CFR 2013)"
],
"url": "https://mlchart.com/terminology/environment/crusher-rated-capacity/"
}
Record 7,004 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.