MLchartDataset catalogue

Crusher Rated Capacity

Term · Environment · MLC-T-ENV-007004

Rated capacity in tons per hour of a crusher, grinding mill, bucket elevator, bagging operation, or enclosed truck or railcar loading station; the total surface area of the top screen of a screening operation; the width of a conveyor belt; and the rated capacity in tons of a storage bin.

Table 1. Record
IdentifierMLC-T-ENV-007004
FieldEnvironment
References40 CFR 60.671 (CFR 2013)
Record as JSON
{
  "id": "MLC-T-ENV-007004",
  "term": "Crusher Rated Capacity",
  "field": "Environment",
  "definition": "Rated capacity in tons per hour of a crusher, grinding mill, bucket elevator, bagging operation, or enclosed truck or railcar loading station; the total surface area of the top screen of a screening operation; the width of a conveyor belt; and the rated capacity in tons of a storage bin.",
  "references": [
    "40 CFR 60.671 (CFR 2013)"
  ],
  "url": "https://mlchart.com/terminology/environment/crusher-rated-capacity/"
}

Record 7,004 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.