Equipment Startup

Term · Environment · MLC-T-ENV-010012

1. Setting into operation of a piece of equipment or a control device that is subject to this subpart. [40 CFR 63.1001 (CFR 2013)]

2. Setting into operation of an affected source, a TPPU(s) within an affected source, a waste management unit or unit operation within an affected source, or equipment required or used to comply with this subpart, or a storage vessel after emptying and degassing. For both continuous and batch processes, start-up includes initial start-up and operation solely for testing equipment. For both continuous and batch processes, start-up does not include the recharging of equipment in batch operation. For continuous processes, start-up includes transitional conditions due to changes in product for flexible operation units. For batch processes, start-up does not include transitional conditions due to changes in product for flexible operation units.

3. Setting into operation of a glycol dehydration unit, or other affected equipment under this subpart, or equipment required or used to comply with this subpart. Startup includes initial startup and operation solely for the purpose of testing equipment. [40 CFR 63.761 (CFR 2013)]

4. Bringing equipment online and starting the production process.

5. Setting into operation of any air pollution control equipment, process equipment, or process for any purpose. Specifically, for Units 1, 2, or 3, startup ends when the unit reaches 40 MW net load. For Units 4 or 5, startup ends when the unit reaches 400 MW net load.

6. Period of operation for thermal chip dryers, scrap dryers/delacquering kilns, decoating kilns, dross-only furnaces, group 1 furnaces, in-line fluxers, sweat furnaces and group 2 furnaces that begins with equipment warming from a shutdown, that is, the equipment is at or near ambient temperature. Startup ends at the point that flux or feed/charge is introduced.

7. Setting in operation of a continuous process unit for any purpose; the first time a new or reconstructed batch process unit begins production; for new equipment added, including equipment used to comply with this subpart, the first time the equipment is put into operation; or, for the introduction of a new product/process, the first time the product or process is run in equipment. For batch process units, startup does not apply to the first time the equipment is put into operation at the start of a campaign to produce a product that has been produced in the past, after a shutdown for maintenance, or when the equipment is put into operation as part of a batch within a campaign. As used in § 63.1255, startup means the setting in operation of a piece of equipment or a control device that is subject to this subpart.

8. Setting in operation of a continuous operation for any purpose; the first time a new or reconstructed batch operation begins production; for new equipment added, including equipment required or used to comply with this subpart, the first time the equipment is put into operation; or for the introduction of a new product/process, the first time the product or process is run in equipment. For batch operations, startup applies to the first time the equipment is put into operation at the start of a campaign to produce a product that has been produced in the past if the steps taken to begin production differ from those specified in a standard batch or nonstandard batch. Startup does not apply when the equipment is put into operation as part of a batch within a campaign when the steps taken are routine operations.

9. For a unit operation with a continuous process vent, means the setting in operation of the unit for any purpose. The period of startup ends upon completion of the transient, non-equilibrium step at the time operating conditions reach steady state for operating parameters such as temperature, pressure, composition, feed rate, and production rate. Periods of startup described by SOP manuals at the affected source may be used to determine the period of startup.

Table 1. Record
IdentifierMLC-T-ENV-010012
FieldEnvironment
References40 CFR 63.1020 (CFR 2013); 40 CFR 63.1312 (CFR 2013); 40 CFR 63.1271 (CFR 2013); 40 CFR 63.2292 (CFR 2013); 40 CFR 49.5512 (CFR 2013); 40 CFR 63.1503 (CFR 2016); 40 CFR 63.1251 (CFR 2013); 40 CFR 63.2550 (CFR 2013); 40 CFR 63.11502 (CFR 2013)
Record as JSON
{
  "id": "MLC-T-ENV-010012",
  "term": "Equipment Startup",
  "field": "Environment",
  "definition": "1. Setting into operation of a piece of equipment or a control device that is subject to this subpart. [40 CFR 63.1001 (CFR 2013)]\n\n2. Setting into operation of an affected source, a TPPU(s) within an affected source, a waste management unit or unit operation within an affected source, or equipment required or used to comply with this subpart, or a storage vessel after emptying and degassing. For both continuous and batch processes, start-up includes initial start-up and operation solely for testing equipment. For both continuous and batch processes, start-up does not include the recharging of equipment in batch operation. For continuous processes, start-up includes transitional conditions due to changes in product for flexible operation units. For batch processes, start-up does not include transitional conditions due to changes in product for flexible operation units.\n\n3. Setting into operation of a glycol dehydration unit, or other affected equipment under this subpart, or equipment required or used to comply with this subpart. Startup includes initial startup and operation solely for the purpose of testing equipment. [40 CFR 63.761 (CFR 2013)]\n\n4. Bringing equipment online and starting the production process.\n\n5. Setting into operation of any air pollution control equipment, process equipment, or process for any purpose. Specifically, for Units 1, 2, or 3, startup ends when the unit reaches 40 MW net load. For Units 4 or 5, startup ends when the unit reaches 400 MW net load.\n\n6. Period of operation for thermal chip dryers, scrap dryers/delacquering kilns, decoating kilns, dross-only furnaces, group 1 furnaces, in-line fluxers, sweat furnaces and group 2 furnaces that begins with equipment warming from a shutdown, that is, the equipment is at or near ambient temperature. Startup ends at the point that flux or feed/charge is introduced.\n\n7. Setting in operation of a continuous process unit for any purpose; the first time a new or reconstructed batch process unit begins production; for new equipment added, including equipment used to comply with this subpart, the first time the equipment is put into operation; or, for the introduction of a new product/process, the first time the product or process is run in equipment. For batch process units, startup does not apply to the first time the equipment is put into operation at the start of a campaign to produce a product that has been produced in the past, after a shutdown for maintenance, or when the equipment is put into operation as part of a batch within a campaign. As used in § 63.1255, startup means the setting in operation of a piece of equipment or a control device that is subject to this subpart.\n\n8. Setting in operation of a continuous operation for any purpose; the first time a new or reconstructed batch operation begins production; for new equipment added, including equipment required or used to comply with this subpart, the first time the equipment is put into operation; or for the introduction of a new product/process, the first time the product or process is run in equipment. For batch operations, startup applies to the first time the equipment is put into operation at the start of a campaign to produce a product that has been produced in the past if the steps taken to begin production differ from those specified in a standard batch or nonstandard batch. Startup does not apply when the equipment is put into operation as part of a batch within a campaign when the steps taken are routine operations.\n\n9. For a unit operation with a continuous process vent, means the setting in operation of the unit for any purpose. The period of startup ends upon completion of the transient, non-equilibrium step at the time operating conditions reach steady state for operating parameters such as temperature, pressure, composition, feed rate, and production rate. Periods of startup described by SOP manuals at the affected source may be used to determine the period of startup.",
  "references": [
    "40 CFR 63.1020 (CFR 2013)",
    "40 CFR 63.1312 (CFR 2013)",
    "40 CFR 63.1271 (CFR 2013)",
    "40 CFR 63.2292 (CFR 2013)",
    "40 CFR 49.5512 (CFR 2013)",
    "40 CFR 63.1503 (CFR 2016)",
    "40 CFR 63.1251 (CFR 2013)",
    "40 CFR 63.2550 (CFR 2013)",
    "40 CFR 63.11502 (CFR 2013)"
  ],
  "url": "https://mlchart.com/terminology/environment/equipment-startup/"
}