MLchartDataset catalogue

Integrated Measurement

Term · Environment · MLC-T-ENV-014618

Integrated measurement involves collection of samples over a selected, or integrated, time period in the field. The collected sample is then sent to a laboratory for analysis. In the BASE study these methods were generally used to collect samples at fixed sites during a nominal eight to nine-hour period equating to the normal occupant working hours. Integrated bioaerosol samples were also collected over an integrated period, but over a 2 or 5 minutes sampling time period.

Table 1. Record
IdentifierMLC-T-ENV-014618
FieldEnvironment
SubjectAir
ReferencesIndoor Air Quality Glossary
Record as JSON
{
  "id": "MLC-T-ENV-014618",
  "term": "Integrated Measurement",
  "field": "Environment",
  "definition": "Integrated measurement involves collection of samples over a selected, or integrated, time period in the field. The collected sample is then sent to a laboratory for analysis. In the BASE study these methods were generally used to collect samples at fixed sites during a nominal eight to nine-hour period equating to the normal occupant working hours. Integrated bioaerosol samples were also collected over an integrated period, but over a 2 or 5 minutes sampling time period.",
  "subject": "Air",
  "references": [
    "Indoor Air Quality Glossary"
  ],
  "url": "https://mlchart.com/terminology/environment/integrated-measurement/"
}

Record 14,618 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.