MLchartDataset catalogue

Landfill Modification

Term · Environment · MLC-T-ENV-015346

Increase in the permitted volume design capacity of the landfill by either horizontal or vertical expansion based on its permitted design capacity as of May 30, 1991. Modification does not occur until the owner or operator commences construction on the horizontal or vertical expansion.

Table 1. Record
IdentifierMLC-T-ENV-015346
FieldEnvironment
References40 CFR 60.751 (CFR 2013)
Record as JSON
{
  "id": "MLC-T-ENV-015346",
  "term": "Landfill Modification",
  "field": "Environment",
  "definition": "Increase in the permitted volume design capacity of the landfill by either horizontal or vertical expansion based on its permitted design capacity as of May 30, 1991. Modification does not occur until the owner or operator commences construction on the horizontal or vertical expansion.",
  "references": [
    "40 CFR 60.751 (CFR 2013)"
  ],
  "url": "https://mlchart.com/terminology/environment/landfill-modification/"
}

Record 15,346 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.