MLchartDataset catalogue

Maximum smelter production capacity

Term · Environment · MLC-T-ENV-016773

Either the maximum demonstrated rate at which a smelter has produced its principal metallic final product under the process equipment configuration and operating procedures prevailing on or before August 7, 1977, or a rate which the smelter is able to demonstrate by calculation is attainable with process equipment existing on August 7, 1977. The rate may be expressed as a concentrate feed rate to the smelter.

Table 1. Record
IdentifierMLC-T-ENV-016773
FieldEnvironment
SubjectRegulatory activities
References40 CFR 57.103 (CFR 2013)