MLchartDataset catalogue

Reconstructed Potroom Group

Term · Environment · MLC-T-ENV-023355

Existing potroom group for which the components are replaced to such an extent that the fixed capital cost of the new components exceeds 50 percent of the fixed capital cost that would be required to construct a comparable entirely new potroom group, and for which it is technologically and economically feasible to meet the applicable emission limits for total fluoride set forth in this subpart.

Table 1. Record
IdentifierMLC-T-ENV-023355
FieldEnvironment
References40 CFR 63.842 (CFR 2013)
Record as JSON
{
  "id": "MLC-T-ENV-023355",
  "term": "Reconstructed Potroom Group",
  "field": "Environment",
  "definition": "Existing potroom group for which the components are replaced to such an extent that the fixed capital cost of the new components exceeds 50 percent of the fixed capital cost that would be required to construct a comparable entirely new potroom group, and for which it is technologically and economically feasible to meet the applicable emission limits for total fluoride set forth in this subpart.",
  "references": [
    "40 CFR 63.842 (CFR 2013)"
  ],
  "url": "https://mlchart.com/terminology/environment/reconstructed-potroom-group/"
}

Record 23,355 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.