MLchartDataset catalogue

Within Impoundment Area

Term · Environment · MLC-T-ENV-030521

1. For all impoundments for purposes of calculating the volume of process wastewater which may be discharged, shall mean the surface area within the impoundment at the maximum capacity plus the area of the inside and outside slopes of the impoundment dam and the surface area between the outside edge of the impoundment dam and seepage ditches upon which rain falls and is returned to the impoundment. For the purpose of such calculations, the surface area allowance for external appurtenances to the impoundment shall not be more than 30 percent of the water surface area within the impoundment dam at maximum capacity.

2. For all impoundments constructed prior to the effective date of the interim final regulation (40 FR 8513), when used to calculate the volume of process wastewater which may be discharged, means the water surface area within the impoundment at maximum capacity plus the surface area of the inside and outside slopes of the impoundment dam as well as the surface area between the outside edge of the impoundment dam and any seepage ditch adjacent to the dam upon which rain falls and is returned to the impoundment. For the purpose of such calculations, the surface area allowances set forth above shall not exceed more than 30 percent of the water surface area within the impoundment dam at maximum capacity.

3. For all impoundments constructed on or after the effective date of the interim final regulation (the interim regulation was effective February 27, 1975; 40 FR 8513, February 27, 1975), for purposes of calculating the volume of process wastewater which may be discharged, means the water surface area within the impoundment at maximum capacity.

4. For all impoundments constructed prior to the effective date of this regulation when used for purposes of calculating the volume of process wastewater which may be discharged shall mean the water surface area within the impoundment at maximum capacity plus the surface area of the inside and outside slopes of the impoundment dam as well as the surface area between the outside edge of the impoundment dam and any seepage ditch immediately adjacent to the dam upon which rain falls and is returned to the impoundment. For the purpose of such calculations, the surface area allowances set forth above shall not be more than 30 percent of the water surface area within the impoundment dam at maximum capacity.

Table 1. Record
IdentifierMLC-T-ENV-030521
FieldEnvironment
References40 CFR 421.11 (CFR 2013); 40 CFR 421.41 (CFR 2013); 40 CFR 421.61 (CFR 2013)
Record as JSON
{
  "id": "MLC-T-ENV-030521",
  "term": "Within Impoundment Area",
  "field": "Environment",
  "definition": "1. For all impoundments for purposes of calculating the volume of process wastewater which may be discharged, shall mean the surface area within the impoundment at the maximum capacity plus the area of the inside and outside slopes of the impoundment dam and the surface area between the outside edge of the impoundment dam and seepage ditches upon which rain falls and is returned to the impoundment. For the purpose of such calculations, the surface area allowance for external appurtenances to the impoundment shall not be more than 30 percent of the water surface area within the impoundment dam at maximum capacity.\n\n2. For all impoundments constructed prior to the effective date of the interim final regulation (40 FR 8513), when used to calculate the volume of process wastewater which may be discharged, means the water surface area within the impoundment at maximum capacity plus the surface area of the inside and outside slopes of the impoundment dam as well as the surface area between the outside edge of the impoundment dam and any seepage ditch adjacent to the dam upon which rain falls and is returned to the impoundment. For the purpose of such calculations, the surface area allowances set forth above shall not exceed more than 30 percent of the water surface area within the impoundment dam at maximum capacity.\n\n3. For all impoundments constructed on or after the effective date of the interim final regulation (the interim regulation was effective February 27, 1975; 40 FR 8513, February 27, 1975), for purposes of calculating the volume of process wastewater which may be discharged, means the water surface area within the impoundment at maximum capacity.\n\n4. For all impoundments constructed prior to the effective date of this regulation when used for purposes of calculating the volume of process wastewater which may be discharged shall mean the water surface area within the impoundment at maximum capacity plus the surface area of the inside and outside slopes of the impoundment dam as well as the surface area between the outside edge of the impoundment dam and any seepage ditch immediately adjacent to the dam upon which rain falls and is returned to the impoundment. For the purpose of such calculations, the surface area allowances set forth above shall not be more than 30 percent of the water surface area within the impoundment dam at maximum capacity.",
  "references": [
    "40 CFR 421.11 (CFR 2013)",
    "40 CFR 421.41 (CFR 2013)",
    "40 CFR 421.61 (CFR 2013)"
  ],
  "url": "https://mlchart.com/terminology/environment/within-impoundment-area/"
}

Record 30,521 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.