MLchartDataset catalogue

Patent · US6126738A · A · US

Method for producing aggregate

(11) Publication number
US6126738A
(21) Application number
US-11109598-A
(22) Filing date
1998-07-06
(30) Priority date
1998-07-06
(43) Publication date
2000-10-03
(45) Date of grant
2000-10-03
(52) CPC
  • C04B Lime, magnesia; slag; cements; compositions thereof, e.g. mortars, concrete or like building materials; artificial stone {}; ceramics; refractories; treatment of natural stone: 18/085, 18/021
  • B28B Shaping clay or other ceramic compositions; shaping slag; shaping mixtures containing cementitious material, e.g. plaster: 1/004
  • Y02W Climate change mitigation technologies related to wastewater treatment or waste management: 30/91
  • Y10S Technical subjects covered by former uspc cross-reference art collections [xracs] and digests: 106/01, 264/49
(73) Assignee
TRANSASH
(54) Title
Method for producing aggregate
(57) Abstract

A method for making aggregate includes the following steps: (a) preparing a wet mixture by mixing water with a combination of ingredients in a mixer, the combination of ingredients including by weight about, 68% to 95% fly-ash and 2% to 10% lime; (b) dropping the wet mixture into at least one pile on a base surface; (c) allowing the wet mixture in the pile to substantially completely hydrolyze into a hard product; and (d) crushing the product to form the aggregate. Preferably, step (b) further includes forming an arcuate stack having multiple overlapping conical piles of the dropped wet mixture such that the stack extends a circular distance over the surface. The wet mixture may be transported from the mixer to a height above the surface and dropped to the surface by a radial stacker. The combination of ingredients, preferably, further includes by weight 0.5% to 12% alkali hydroxide and, more particularly, sodium hydroxide.

Full text
View on Google Patents

Claims (22)

  1. A method for making aggregate comprising: (a) preparing a wet mixture by mixing water with a combination of ingredients in a mixer, the combination of ingredients comprising by weight about, 68% to 95% fly-ash and 2% to 10% lime; (b) dropping the wet mixture into at least one pile on a base surface; (c) allowing the wet mixture in the pile to substantially completely hydrolyze into a hard product; and (d) crushing the product to form the aggregate.
  2. A method as claimed in claim 1 wherein said step (b) further comprises forming a stack having multiple overlapping piles of the dropped wet mixture such that the stack extends a distance over the surface.
  3. A method as claimed in claim 2 wherein the wet mixture is transported from the mixer to over the surface and dropped to the surface by a radial stacker.
  4. A method as claimed in claim 3 wherein the radial stacker is incrementally stepped through an arc stopping at angular positions of the arc to drop the wet mixture and form each of the piles of the stack such that the stack extends a circular distance over the surface.
  5. A method as claimed in claim 4 wherein said step (b) further comprises running off water that seeps to the base surface from the stack and directing the water away from the piles and stack by having the base surface on a drainage base thats runs off water that seeps to the base surface from the stack and directs the water away from the piles and stack.
  6. A method as claimed in claim 4 further comprising an excavation step (c1) between said steps (c) and (d), wherein said excavation step (c1) comprises excavating hydrolyzed portions of the stack to collect corresponding portions of the hard product and transporting the excavated portions of the hard product to a crusher for the crushing in said step (d) while the radial stacker is performing the dropping of the wet mixture in said step (b).
  7. A method as claimed in claim 6 wherein in said step (b) the base surface is on a drainage base thats runs off water that seeps to the base surface from the stack and directs the water away from the piles and stack.
  8. A method as claimed in claim 6 wherein said step (b) further comprises the radial stacker cycling through the entire arc in about between 20-30 days during which the piles and the stack are formed from a beginning of the stack to an end of the stack.
  9. A method as claimed in claim 8 wherein said excavation step (c1) is initiated at the beginning of the stack after an initial curing period of the stack of about between 14 to 28 days after said step (b) is initiated and during which the stack is hydrolyzing.
  10. A method as claimed in claim 9 wherein the excavation is done with a loader that breaks up the stack and transports the hard product to a crusher for crushing.
  11. A method as claimed in claim 10 wherein said steps (a) through (d) are performed on a coal burning plant site using fly-ash from a combustion process of the plant.
  12. A method as claimed in claim 10 wherein said step (b) further comprises running off water that seeps to the base surface from the stack and directing the water away from the piles and stack by having the base surface on a drainage base thats runs off water that seeps to the base surface from the stack and directs the water away from the piles and stack.
  13. A method as claimed in claim 10 wherein the multiple overlapping piles are formed generally conical in shape, having peaks at heights in a range of about between 8 to 50 feet from the base surface, and having diameters at the base surface in a range of about between 16 to 100 feet.
  14. A method for making aggregate comprising: (a) preparing a wet mixture by mixing water with a combination of ingredients in a mixer, the combination of ingredients comprising by weight about, 68% to 95% fly-ash, 2% to 10% lime and 0.5% to 12% alkali hydroxide; (b) dropping the wet mixture into at least one pile on a base surface; (c) allowing the wet mixture in the pile to substantially completely hydrolyze into a hard product; and (d) crushing the product to form the aggregate.
  15. A method as claimed in claim 14 wherein said step (b) further comprises transporting the wet mixture from the mixer to over the surface and dropping the wet mixture to the surface by a radial stacker and forming a stack having multiple overlapping piles of the dropped wet mixture such that the stack extends a distance over the surface.
  16. A method as claimed in claim 15 wherein the radial stacker is incrementally stepped through an arc stopping at angular positions of the arc to drop the wet mixture and form each of the piles of the stack such that the stack extends a circular distance over the surface.
  17. A method as claimed in claim 15 further comprising an excavation step (c1) between said steps (c) and (d), wherein said excavation step (c1) comprises excavating hydrolyzed portions of the stack to collect corresponding portions of the hard product and transporting the excavated portions of the hard product to a crusher for the crushing in said step (d) while the radial stacker is performing the dropping of the wet mixture in said step (b).
  18. A method as claimed in claim 16 wherein said step (b) further comprises the radial stacker cycling through the entire arc in about between 20-30 days during which the piles and the stack are formed from a beginning of the stack to an end of the stack.
  19. A method as claimed in claim 18 wherein said excavation step (c1) is initiated at the beginning of the stack after an initial curing period of the stack of about between 14 to 28 days after said step (b) is initiated and during which the stack is hydrolyzing.
  20. A method as claimed in claim 19 wherein said steps (a) through (d) are performed on a coal burning plant site using fly-ash from a combustion process of the plant.
  21. A method as claimed in claim 19 wherein said step (b) further comprises running off water that seeps to the base surface from the stack and directing the water away from the piles and stack by having the base surface on a drainage base to run off water that seeps to the base surface from the stack and direct the water away from the piles and stack.
  22. A method as claimed in claim 21 wherein the multiple overlapping piles are formed generally conical in shape, having peaks at heights in a range of about between 8 to 50 feet from the base surface, and having diameters at the base surface in a range of about between 16 to 100 feet.

Citations (36)

  • NL6507998A
  • US34775A
  • US3765920A
  • US3785840A
  • US3852084A
  • US4018619A
  • US4040852A
  • US4082561A
  • US4105463A
  • US4172518A
  • US4210457A
  • US4217143A
  • US4229222A
  • US4268316A
  • US4496267A
  • US4547223A
  • US4624711A
  • US4770831A
  • US4804147A
  • US4909849A
  • US4992102A
  • US5137753A
  • US5196620A
  • US5211750A
  • US5230587A
  • US5266111A
  • US5322562A
  • US5352035A
  • US5352288A
  • US5401312A
  • US5484479A
  • US5500044A
  • US5542977A
  • US5609836A
  • US5704972A
  • USRE34775E
Record as JSON
{
  "publication_number": "US6126738A",
  "country": "US",
  "kind": "A",
  "title": "Method for producing aggregate",
  "abstract": "A method for making aggregate includes the following steps: (a) preparing a wet mixture by mixing water with a combination of ingredients in a mixer, the combination of ingredients including by weight about, 68% to 95% fly-ash and 2% to 10% lime; (b) dropping the wet mixture into at least one pile on a base surface; (c) allowing the wet mixture in the pile to substantially completely hydrolyze into a hard product; and (d) crushing the product to form the aggregate. Preferably, step (b) further includes forming an arcuate stack having multiple overlapping conical piles of the dropped wet mixture such that the stack extends a circular distance over the surface. The wet mixture may be transported from the mixer to a height above the surface and dropped to the surface by a radial stacker. The combination of ingredients, preferably, further includes by weight 0.5% to 12% alkali hydroxide and, more particularly, sodium hydroxide.",
  "claims": [
    "1. A method for making aggregate comprising: (a) preparing a wet mixture by mixing water with a combination of ingredients in a mixer, the combination of ingredients comprising by weight about, 68% to 95% fly-ash and 2% to 10% lime; (b) dropping the wet mixture into at least one pile on a base surface; (c) allowing the wet mixture in the pile to substantially completely hydrolyze into a hard product; and (d) crushing the product to form the aggregate.",
    "2. A method as claimed in claim 1 wherein said step (b) further comprises forming a stack having multiple overlapping piles of the dropped wet mixture such that the stack extends a distance over the surface.",
    "3. A method as claimed in claim 2 wherein the wet mixture is transported from the mixer to over the surface and dropped to the surface by a radial stacker.",
    "4. A method as claimed in claim 3 wherein the radial stacker is incrementally stepped through an arc stopping at angular positions of the arc to drop the wet mixture and form each of the piles of the stack such that the stack extends a circular distance over the surface.",
    "5. A method as claimed in claim 4 wherein said step (b) further comprises running off water that seeps to the base surface from the stack and directing the water away from the piles and stack by having the base surface on a drainage base thats runs off water that seeps to the base surface from the stack and directs the water away from the piles and stack.",
    "6. A method as claimed in claim 4 further comprising an excavation step (c1) between said steps (c) and (d), wherein said excavation step (c1) comprises excavating hydrolyzed portions of the stack to collect corresponding portions of the hard product and transporting the excavated portions of the hard product to a crusher for the crushing in said step (d) while the radial stacker is performing the dropping of the wet mixture in said step (b).",
    "7. A method as claimed in claim 6 wherein in said step (b) the base surface is on a drainage base thats runs off water that seeps to the base surface from the stack and directs the water away from the piles and stack.",
    "8. A method as claimed in claim 6 wherein said step (b) further comprises the radial stacker cycling through the entire arc in about between 20-30 days during which the piles and the stack are formed from a beginning of the stack to an end of the stack.",
    "9. A method as claimed in claim 8 wherein said excavation step (c1) is initiated at the beginning of the stack after an initial curing period of the stack of about between 14 to 28 days after said step (b) is initiated and during which the stack is hydrolyzing.",
    "10. A method as claimed in claim 9 wherein the excavation is done with a loader that breaks up the stack and transports the hard product to a crusher for crushing.",
    "11. A method as claimed in claim 10 wherein said steps (a) through (d) are performed on a coal burning plant site using fly-ash from a combustion process of the plant.",
    "12. A method as claimed in claim 10 wherein said step (b) further comprises running off water that seeps to the base surface from the stack and directing the water away from the piles and stack by having the base surface on a drainage base thats runs off water that seeps to the base surface from the stack and directs the water away from the piles and stack.",
    "13. A method as claimed in claim 10 wherein the multiple overlapping piles are formed generally conical in shape, having peaks at heights in a range of about between 8 to 50 feet from the base surface, and having diameters at the base surface in a range of about between 16 to 100 feet.",
    "14. A method for making aggregate comprising: (a) preparing a wet mixture by mixing water with a combination of ingredients in a mixer, the combination of ingredients comprising by weight about, 68% to 95% fly-ash, 2% to 10% lime and 0.5% to 12% alkali hydroxide; (b) dropping the wet mixture into at least one pile on a base surface; (c) allowing the wet mixture in the pile to substantially completely hydrolyze into a hard product; and (d) crushing the product to form the aggregate.",
    "15. A method as claimed in claim 14 wherein said step (b) further comprises transporting the wet mixture from the mixer to over the surface and dropping the wet mixture to the surface by a radial stacker and forming a stack having multiple overlapping piles of the dropped wet mixture such that the stack extends a distance over the surface.",
    "16. A method as claimed in claim 15 wherein the radial stacker is incrementally stepped through an arc stopping at angular positions of the arc to drop the wet mixture and form each of the piles of the stack such that the stack extends a circular distance over the surface.",
    "17. A method as claimed in claim 15 further comprising an excavation step (c1) between said steps (c) and (d), wherein said excavation step (c1) comprises excavating hydrolyzed portions of the stack to collect corresponding portions of the hard product and transporting the excavated portions of the hard product to a crusher for the crushing in said step (d) while the radial stacker is performing the dropping of the wet mixture in said step (b).",
    "18. A method as claimed in claim 16 wherein said step (b) further comprises the radial stacker cycling through the entire arc in about between 20-30 days during which the piles and the stack are formed from a beginning of the stack to an end of the stack.",
    "19. A method as claimed in claim 18 wherein said excavation step (c1) is initiated at the beginning of the stack after an initial curing period of the stack of about between 14 to 28 days after said step (b) is initiated and during which the stack is hydrolyzing.",
    "20. A method as claimed in claim 19 wherein said steps (a) through (d) are performed on a coal burning plant site using fly-ash from a combustion process of the plant.",
    "21. A method as claimed in claim 19 wherein said step (b) further comprises running off water that seeps to the base surface from the stack and directing the water away from the piles and stack by having the base surface on a drainage base to run off water that seeps to the base surface from the stack and direct the water away from the piles and stack.",
    "22. A method as claimed in claim 21 wherein the multiple overlapping piles are formed generally conical in shape, having peaks at heights in a range of about between 8 to 50 feet from the base surface, and having diameters at the base surface in a range of about between 16 to 100 feet."
  ],
  "cpc": [
    "C04B 18/085",
    "B28B 1/004",
    "C04B 18/021",
    "Y02W 30/91",
    "Y10S 106/01",
    "Y10S 264/49"
  ],
  "assignees": [
    "TRANSASH"
  ],
  "filing_date": "1998-07-06",
  "publication_date": "2000-10-03",
  "grant_date": "2000-10-03",
  "priority_date": "1998-07-06",
  "application_number": "US-11109598-A",
  "family_id": "22336571",
  "citations": [
    "NL6507998A",
    "US34775A",
    "US3765920A",
    "US3785840A",
    "US3852084A",
    "US4018619A",
    "US4040852A",
    "US4082561A",
    "US4105463A",
    "US4172518A",
    "US4210457A",
    "US4217143A",
    "US4229222A",
    "US4268316A",
    "US4496267A",
    "US4547223A",
    "US4624711A",
    "US4770831A",
    "US4804147A",
    "US4909849A",
    "US4992102A",
    "US5137753A",
    "US5196620A",
    "US5211750A",
    "US5230587A",
    "US5266111A",
    "US5322562A",
    "US5352035A",
    "US5352288A",
    "US5401312A",
    "US5484479A",
    "US5500044A",
    "US5542977A",
    "US5609836A",
    "US5704972A",
    "USRE34775E"
  ]
}

Record 3,504 of 5,000 in Patents full text (MLC-0201). Request the full dataset.