MLchartDataset catalogue

Construction Service

Term · Environment · MLC-T-ENV-006269

1. Meaning given in 40 CFR 52.21.

2. Any placement, assembly, or installation of facilities or equipment (including contractual obligations to purchase such facilities or equipment) at the premises where such equipment will be used, including preparation work at such premises.

3. Fabrication, erection, or installation.

4. Fabrication, erection, or installation of an affected facility. [40 CFR 60.2 (CFR 2013)].

5. Onsite fabrication, erection, or installation of an affected source or a PMPU. Addition of new equipment to a PMPU subject to existing source standards does not constitute construction, but it may constitute reconstruction of the affected source or PMPU if it satisfies the definition of reconstruction in this section.

6. Any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of a source) which would result in a change in actual emissions.

7. Onsite fabrication, erection, or installation of an affected source. Addition of new equipment to an affected source does not constitute construction, but it may constitute reconstruction of the affected source if it satisfies the definition of reconstruction in § 63.2.

8. Any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) which would result in a change in actual emissions.

9. Fabrication, erection, or installation of a unit or any portion of a unit.

10. Onsite fabrication, erection, or installation of an affected source or MCPU. Addition of new equipment to an MCPU subject to existing source standards does not constitute construction, but it may constitute reconstruction of the affected source or MCPU if it satisfies the definition of reconstruction in § 63.2.

Table 1. Record
IdentifierMLC-T-ENV-006269
FieldEnvironment
References40 CFR 124.41 (CFR 2013); 40 CFR 129.2 (CFR 2013); 40 CFR 52.01 (CFR 2013); 40 CFR 61.02 (CFR 2013); 40 CFR 63.1251 (CFR 2013); 40 CFR 49.10711 (CFR 2013); 40 CFR 63.11607 (CFR 2013); 40 CFR 49.22 (CFR 2013); 40 CFR 72.2 (CFR 2013); 40 CFR 63.2550 (CFR 2013)
Record as JSON
{
  "id": "MLC-T-ENV-006269",
  "term": "Construction Service",
  "field": "Environment",
  "definition": "1. Meaning given in 40 CFR 52.21.\n\n2. Any placement, assembly, or installation of facilities or equipment (including contractual obligations to purchase such facilities or equipment) at the premises where such equipment will be used, including preparation work at such premises.\n\n3. Fabrication, erection, or installation.\n\n4. Fabrication, erection, or installation of an affected facility. [40 CFR 60.2 (CFR 2013)].\n\n5. Onsite fabrication, erection, or installation of an affected source or a PMPU. Addition of new equipment to a PMPU subject to existing source standards does not constitute construction, but it may constitute reconstruction of the affected source or PMPU if it satisfies the definition of reconstruction in this section.\n\n6. Any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of a source) which would result in a change in actual emissions.\n\n7. Onsite fabrication, erection, or installation of an affected source. Addition of new equipment to an affected source does not constitute construction, but it may constitute reconstruction of the affected source if it satisfies the definition of reconstruction in § 63.2.\n\n8. Any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) which would result in a change in actual emissions.\n\n9. Fabrication, erection, or installation of a unit or any portion of a unit.\n\n10. Onsite fabrication, erection, or installation of an affected source or MCPU. Addition of new equipment to an MCPU subject to existing source standards does not constitute construction, but it may constitute reconstruction of the affected source or MCPU if it satisfies the definition of reconstruction in § 63.2.",
  "references": [
    "40 CFR 124.41 (CFR 2013)",
    "40 CFR 129.2 (CFR 2013)",
    "40 CFR 52.01 (CFR 2013)",
    "40 CFR 61.02 (CFR 2013)",
    "40 CFR 63.1251 (CFR 2013)",
    "40 CFR 49.10711 (CFR 2013)",
    "40 CFR 63.11607 (CFR 2013)",
    "40 CFR 49.22 (CFR 2013)",
    "40 CFR 72.2 (CFR 2013)",
    "40 CFR 63.2550 (CFR 2013)"
  ],
  "url": "https://mlchart.com/terminology/environment/construction-service/"
}

Record 6,269 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.