Existing CCR surface impoundment
Term · Environment · MLC-T-ENV-010332
CCR surface impoundment that receives CCR both before and after October 19, 2015, or for which construction commenced prior to October 19, 2015 and receives CCR on or after October 19, 2015. A CCR surface impoundment has commenced construction if the owner or operator has obtained the federal, state, and local approvals or permits necessary to begin physical construction and a continuous on-site, physical construction program had begun prior to October 19, 2015.
| Identifier | MLC-T-ENV-010332 |
|---|---|
| Field | Environment |
| Subject | Built environments |
| References | 40 CFR 257.53 (CFR 2016) |
Record as JSON
{
"id": "MLC-T-ENV-010332",
"term": "Existing CCR surface impoundment",
"field": "Environment",
"term_source": "Existing CCR Surface Impoundment",
"definition": "CCR surface impoundment that receives CCR both before and after October 19, 2015, or for which construction commenced prior to October 19, 2015 and receives CCR on or after October 19, 2015. A CCR surface impoundment has commenced construction if the owner or operator has obtained the federal, state, and local approvals or permits necessary to begin physical construction and a continuous on-site, physical construction program had begun prior to October 19, 2015.",
"subject": "Built environments",
"references": [
"40 CFR 257.53 (CFR 2016)"
],
"url": "https://mlchart.com/terminology/environment/existing-ccr-surface-impoundment/"
}
Record 10,080 of 29,894 in Environment terminology (MLC-0121). Request the full dataset.