Existing hazardous waste management facility
Term · Environment · MLC-T-ENV-010346
Facility which was in operation or for which construction commenced on or before November 19, 1980. A facility has commenced construction if:(1) The owner or operator has obtained the Federal, State and local approvals or permits necessary to begin physical construction; and either(2)(i) A continuous on-site, physical construction program has begun; or(ii) The owner or operator has entered into contractual obligations - which cannot be cancelled or modified without substantial loss - for physical construction of the facility to be completed within a reasonable time.
| Identifier | MLC-T-ENV-010346 |
|---|---|
| Field | Environment |
| Subject | Built environments |
| Abbreviation | Existing HWM Facility |
| References | 40 CFR 260.10 (CFR 2013); 40 CFR 270.2 (CFR 2018); 40 CFR 260.10 (CFR 2020) |
Record as JSON
{
"id": "MLC-T-ENV-010346",
"term": "Existing hazardous waste management facility",
"field": "Environment",
"term_source": "Existing Hazardous Waste Management Facility",
"definition": "Facility which was in operation or for which construction commenced on or before November 19, 1980. A facility has commenced construction if:(1) The owner or operator has obtained the Federal, State and local approvals or permits necessary to begin physical construction; and either(2)(i) A continuous on-site, physical construction program has begun; or(ii) The owner or operator has entered into contractual obligations - which cannot be cancelled or modified without substantial loss - for physical construction of the facility to be completed within a reasonable time.",
"abbreviation": "Existing HWM Facility",
"subject": "Built environments",
"references": [
"40 CFR 260.10 (CFR 2013); 40 CFR 270.2 (CFR 2018); 40 CFR 260.10 (CFR 2020)"
],
"url": "https://mlchart.com/terminology/environment/existing-hazardous-waste-management-facility/"
}
Record 10,094 of 29,894 in Environment terminology (MLC-0121). Request the full dataset.