MLchartDataset catalogue

In Existence Building

Term · Environment · MLC-T-ENV-013947

That the owner or operator has obtained all necessary preconstruction approvals or permits required by Federal, State, or local air pollution emissions and air quality laws or regulations and either has (1) begun, or caused to begin, a continuous program of physical on-site construction of the facility or (2) entered into binding agreements or contractual obligations, which cannot be cancelled or modified without substantial loss to the owner or operator, to undertake a program of construction of the facility to be completed in a reasonable time.

Table 1. Record
IdentifierMLC-T-ENV-013947
FieldEnvironment
References40 CFR 51.301 (CFR 2013)
Record as JSON
{
  "id": "MLC-T-ENV-013947",
  "term": "In Existence Building",
  "field": "Environment",
  "definition": "That the owner or operator has obtained all necessary preconstruction approvals or permits required by Federal, State, or local air pollution emissions and air quality laws or regulations and either has (1) begun, or caused to begin, a continuous program of physical on-site construction of the facility or (2) entered into binding agreements or contractual obligations, which cannot be cancelled or modified without substantial loss to the owner or operator, to undertake a program of construction of the facility to be completed in a reasonable time.",
  "references": [
    "40 CFR 51.301 (CFR 2013)"
  ],
  "url": "https://mlchart.com/terminology/environment/in-existence-building/"
}

Record 13,947 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.