MLchartDataset catalogue

Existing Stack

Term · Environment · MLC-T-ENV-010357

That the owner or operator had (1) begun, or caused to begin, a continuous program of physical on-site construction of the stack or (2) entered into binding agreements or contractual obligations, which could not be cancelled or modified without substantial loss to the owner or operator, to undertake a program of construction of the stack to be completed within a reasonable time.

Table 1. Record
IdentifierMLC-T-ENV-010357
FieldEnvironment
References40 CFR 51.100 (CFR 2013)
Record as JSON
{
  "id": "MLC-T-ENV-010357",
  "term": "Existing Stack",
  "field": "Environment",
  "definition": "That the owner or operator had (1) begun, or caused to begin, a continuous program of physical on-site construction of the stack or (2) entered into binding agreements or contractual obligations, which could not be cancelled or modified without substantial loss to the owner or operator, to undertake a program of construction of the stack to be completed within a reasonable time.",
  "references": [
    "40 CFR 51.100 (CFR 2013)"
  ],
  "url": "https://mlchart.com/terminology/environment/existing-stack/"
}

Record 10,357 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.