Remedy Construction Deferral Expiration
Term · Environment · MLC-T-ENV-023778
1. The event to document the expiration date of the deferral of final remedy construction in specified operating areas at the facility. The CA550OF deferral is only for a specified period of time and shall not extend beyond the active life of the critical process or integral component in the deferred operating area(s) that is the basis for the deferral.
2. When construction of the final remedy has been deferred at the facility level (e.g. CA550OF is linked to the 'Entire Facility' area), this event should also be linked to the 'Entire Facility' area. When construction of the final remedy has been deferred for only specific portions of the RCRA facility, this event should be linked to the specific areas affected by the control or controls. If there are more than one remedy deferrals for a facility which may have different expiration dates (e.g., multiple operating process areas which may cease operating at different times), then a separate CA555 event code should be entered for each such area.
| Identifier | MLC-T-ENV-023778 |
|---|---|
| Field | Environment |
| Subject | Emergencies |
| Abbreviation | CA555 |
| References | RCRA Corrective Action Event Codes |
Record as JSON
{
"id": "MLC-T-ENV-023778",
"term": "Remedy Construction Deferral Expiration",
"field": "Environment",
"definition": "1. The event to document the expiration date of the deferral of final remedy construction in specified operating areas at the facility. The CA550OF deferral is only for a specified period of time and shall not extend beyond the active life of the critical process or integral component in the deferred operating area(s) that is the basis for the deferral.\n\n2. When construction of the final remedy has been deferred at the facility level (e.g. CA550OF is linked to the 'Entire Facility' area), this event should also be linked to the 'Entire Facility' area. When construction of the final remedy has been deferred for only specific portions of the RCRA facility, this event should be linked to the specific areas affected by the control or controls. If there are more than one remedy deferrals for a facility which may have different expiration dates (e.g., multiple operating process areas which may cease operating at different times), then a separate CA555 event code should be entered for each such area.",
"abbreviation": "CA555",
"subject": "Emergencies",
"references": [
"RCRA Corrective Action Event Codes"
],
"url": "https://mlchart.com/terminology/environment/remedy-construction-deferral-expiration/"
}
Record 23,778 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.