1. The event when the State of EPA acknowledges in writing that the RCRA facility has completed construction of a facility's remedy that was designed to achieve long-term protection of human health and the environment and that the remedy is fully functional as designed, whether or not final cleanup levels or other requirements have been achieved. Remedy construction may also acknowledge the event where no remedy is constructed.

2. This event code applies when 1) construction of the remedy(ies) have been completed or 2) the Remedy Decision and Response to Comments or other appropriate decision document indicates that no physical construction of a remedy has been needed since site characterization activities began or no construction is necessary beyond what has been implemented prior to the remedy decision as in the case of stabilization measures.

3. Remedy Construction for comprehensive remedies that address the entire facility (including off-site migration of contaminants) must be linked to the "Entire Facility" area. Phased or partial remedies are to be attached to specific area of implementation and not to the "Entire Facility" area.

4. The status code NR - No Remedy Constructed applies on the actual date of the CA400-Remedy Decision if no physical construction of a remedy has been needed since site characterization activities began.

Table 1. Record
IdentifierMLC-T-ENV-023776
FieldEnvironment
SubjectEmergencies
AbbreviationCA550NR
ReferencesRCRA Corrective Action Event Codes
Record as JSON
{
  "id": "MLC-T-ENV-023776",
  "term": "Remedy construction - no remedy constructed",
  "field": "Environment",
  "term_source": "Remedy Construction - No Remedy Constructed",
  "definition": "1. The event when the State of EPA acknowledges in writing that the RCRA facility has completed construction of a facility's remedy that was designed to achieve long-term protection of human health and the environment and that the remedy is fully functional as designed, whether or not final cleanup levels or other requirements have been achieved. Remedy construction may also acknowledge the event where no remedy is constructed.\n\n2. This event code applies when 1) construction of the remedy(ies) have been completed or 2) the Remedy Decision and Response to Comments or other appropriate decision document indicates that no physical construction of a remedy has been needed since site characterization activities began or no construction is necessary beyond what has been implemented prior to the remedy decision as in the case of stabilization measures.\n\n3. Remedy Construction for comprehensive remedies that address the entire facility (including off-site migration of contaminants) must be linked to the \"Entire Facility\" area. Phased or partial remedies are to be attached to specific area of implementation and not to the \"Entire Facility\" area.\n\n4. The status code NR - No Remedy Constructed applies on the actual date of the CA400-Remedy Decision if no physical construction of a remedy has been needed since site characterization activities began.",
  "abbreviation": "CA550NR",
  "subject": "Emergencies",
  "references": [
    "RCRA Corrective Action Event Codes"
  ],
  "url": "https://mlchart.com/terminology/environment/remedy-construction-no-remedy-constructed/"
}

Record 23,141 of 29,894 in Environment terminology (MLC-0121). Request the full dataset.