Subdivision
Term · Insurance and risk management · MLC-T-INS-000230
A community must review subdivision proposals and other proposed new development including manufactured home parks or subdivisions, to determine whether such proposals will be reasonably safe from flooding.
If a subdivision proposal or other proposed new development is in a flood-prone area, any such proposals shall be reviewed to assure that:
• All such proposals are consistent with the need to minimize flood damage within the flood-prone area;
• All public utilities and facilities, such as sewer, gas, electrical, and water systems are located and constructed to minimize or eliminate flood damage; and
• Adequate drainage is provided to reduce exposure to flood hazards.
BASE FLOOD ELEVATION (BFE) DATA REQUIREMENT: Communities must require that all new subdivision proposals and other proposed development (including proposals for manufactured home parks and subdivisions) greater than 50 lots or 5 acres, whichever is the lesser, must include within such proposals, BFE data.
National Flood Insurance Program Requirements
• 60.3 - Flood plain management criteria for flood-prone areas
• (a) (4) - Subdivision Review
• (b) (3) - BFE Data Requirement
Other Applicable NFIP Regulations
• 60.3 - Flood plain management criteria for flood-prone areas
• (c) (6)
• (c) (12)
| Identifier | MLC-T-INS-000230 |
|---|---|
| Field | Insurance and risk management |
| Subject | National Flood Insurance Program |
| References | FEMA Glossary |
Record as JSON
{
"id": "MLC-T-INS-000230",
"term": "Subdivision",
"field": "Insurance and risk management",
"definition": "A community must review subdivision proposals and other proposed new development including manufactured home parks or subdivisions, to determine whether such proposals will be reasonably safe from flooding.\n\nIf a subdivision proposal or other proposed new development is in a flood-prone area, any such proposals shall be reviewed to assure that:\n\n• All such proposals are consistent with the need to minimize flood damage within the flood-prone area;\n\n• All public utilities and facilities, such as sewer, gas, electrical, and water systems are located and constructed to minimize or eliminate flood damage; and\n\n• Adequate drainage is provided to reduce exposure to flood hazards.\n\nBASE FLOOD ELEVATION (BFE) DATA REQUIREMENT: Communities must require that all new subdivision proposals and other proposed development (including proposals for manufactured home parks and subdivisions) greater than 50 lots or 5 acres, whichever is the lesser, must include within such proposals, BFE data.\n\nNational Flood Insurance Program Requirements\n\n• 60.3 - Flood plain management criteria for flood-prone areas\n\n• (a) (4) - Subdivision Review\n\n• (b) (3) - BFE Data Requirement\n\nOther Applicable NFIP Regulations\n\n• 60.3 - Flood plain management criteria for flood-prone areas\n\n• (c) (6)\n\n• (c) (12)",
"subject": "National Flood Insurance Program",
"references": [
"FEMA Glossary"
],
"url": "https://mlchart.com/terminology/insurance/subdivision/"
}
Record 3,330 of 3,748 in Insurance and risk management terminology (MLC-0106). Request the full dataset.