Begin Actual Construction

Term · Environment · MLC-T-ENV-002943

1. In general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operating this term refers to those on-site activities other than preparatory activities which mark the initiation of the change.

2. In general, initiation of physical on-site construction activities on a source which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in the method of operating, this term refers to those on-site activities other than preparatory activities which mark the initiation of the change.

Table 1. Record
IdentifierMLC-T-ENV-002943
FieldEnvironment
References40 CFR 49.22 (CFR 2013); 40 CFR 49.10711 (CFR 2013)
Record as JSON
{
  "id": "MLC-T-ENV-002943",
  "term": "Begin Actual Construction",
  "field": "Environment",
  "definition": "1. In general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operating this term refers to those on-site activities other than preparatory activities which mark the initiation of the change.\n\n2. In general, initiation of physical on-site construction activities on a source which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in the method of operating, this term refers to those on-site activities other than preparatory activities which mark the initiation of the change.",
  "references": [
    "40 CFR 49.22 (CFR 2013)",
    "40 CFR 49.10711 (CFR 2013)"
  ],
  "url": "https://mlchart.com/terminology/environment/begin-actual-construction/"
}

Record 2,943 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.