Land Development
Term · Environment · MLC-T-ENV-015309
The second project phase, following land acquisition and preceding construction. During this phase, raw land is converted into permitted, buildable lot(s) in a process that requires site approvals, hearings, etc. This process can take months to years. Costs incurred during this phase may include “soft” costs for architectural and engineering services, legal work, permits, fees, and testing; and “hard” costs, such as land clearing, installing utilities and roads, and preparing foundations or pads.
| Identifier | MLC-T-ENV-015309 |
|---|---|
| Field | Environment |
| References | EPA Stormwater Discharges from Developed Sites; Glossary from Owner/Developer Long Questionnaire; 4/16/2010 DRAFT VERSION Quoted on NAHB website |
Record as JSON
{
"id": "MLC-T-ENV-015309",
"term": "Land Development",
"field": "Environment",
"definition": "The second project phase, following land acquisition and preceding construction. During this phase, raw land is converted into permitted, buildable lot(s) in a process that requires site approvals, hearings, etc. This process can take months to years. Costs incurred during this phase may include “soft” costs for architectural and engineering services, legal work, permits, fees, and testing; and “hard” costs, such as land clearing, installing utilities and roads, and preparing foundations or pads.",
"references": [
"EPA Stormwater Discharges from Developed Sites; Glossary from Owner/Developer Long Questionnaire; 4/16/2010 DRAFT VERSION Quoted on NAHB website"
],
"url": "https://mlchart.com/terminology/environment/land-development/"
}
Record 15,309 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.