Minimum Control Level
Term · Environment · MLC-T-ENV-017416
The pollutant load that a point source buyer must first meet before buying credits to meet the facility’s baseline. This pollutant load is either the TBEL specified in a permit or the current discharge level, depending on which is more stringent.
| Identifier | MLC-T-ENV-017416 |
|---|---|
| Field | Environment |
| Subject | Policy and guidance |
| References | Water Quality Trading Toolkit for Permit Writers Glossary; Water Quality Toolkit Glossary |
Record as JSON
{
"id": "MLC-T-ENV-017416",
"term": "Minimum Control Level",
"field": "Environment",
"definition": "The pollutant load that a point source buyer must first meet before buying credits to meet the facility’s baseline. This pollutant load is either the TBEL specified in a permit or the current discharge level, depending on which is more stringent.",
"subject": "Policy and guidance",
"references": [
"Water Quality Trading Toolkit for Permit Writers Glossary; Water Quality Toolkit Glossary"
],
"url": "https://mlchart.com/terminology/environment/minimum-control-level/"
}
Record 17,416 of 30,736 in Environment terminology (MLC-0121). Request the full dataset.