Stabilization construction completed - exposure control by barrier and/or institutional control
Term · Environment · MLC-T-ENV-026489
1. The event by which the State or EPA formally notifies the RCRA facility that the interim measures undertaken have been completed to the satisfaction of the Agency; and/or the event by which the State or EPA formally notifies the RCRA facility that stabilization objectives have been met, but require continued operation and maintenance to maintain this level of performance.
2. A status code of EC should be entered when the primary measure is exposure control by barrier and/or institutional control (e.g., capping, fencing, deed restrictions).
| Identifier | MLC-T-ENV-026489 |
|---|---|
| Field | Environment |
| Subject | Emergencies |
| Abbreviation | CA650EC |
| References | RCRA Corrective Action Event Codes |