MLchartDataset catalogue

Stabilization construction completed - groundwater extraction and treatment

Term · Environment · MLC-T-ENV-026490

1. The event by which the State or EPA formally notifies the RCRA facility that the interim measures undertaken have been completed to the satisfaction of the Agency; and/or the event by which the State or EPA formally notifies the RCRA facility that stabilization objectives have been met, but require continued operation and maintenance to maintain this level of performance.

2. A status code of GW should be entered when the primary measure is groundwater extraction and treatment (e.g., to achieve groundwater containment, to achieve MCL).

Table 1. Record
IdentifierMLC-T-ENV-026490
FieldEnvironment
SubjectEmergencies
AbbreviationCA650GW
ReferencesRCRA Corrective Action Event Codes
Record as JSON
{
  "id": "MLC-T-ENV-026490",
  "term": "Stabilization construction completed - groundwater extraction and treatment",
  "field": "Environment",
  "term_source": "Stabilization Construction Completed - Groundwater Extraction and Treatment",
  "definition": "1. The event by which the State or EPA formally notifies the RCRA facility that the interim measures undertaken have been completed to the satisfaction of the Agency; and/or the event by which the State or EPA formally notifies the RCRA facility that stabilization objectives have been met, but require continued operation and maintenance to maintain this level of performance.\n\n2. A status code of GW should be entered when the primary measure is groundwater extraction and treatment (e.g., to achieve groundwater containment, to achieve MCL).",
  "abbreviation": "CA650GW",
  "subject": "Emergencies",
  "references": [
    "RCRA Corrective Action Event Codes"
  ],
  "url": "https://mlchart.com/terminology/environment/stabilization-construction-completed-groundwater-extraction-and-treatment/"
}

Record 25,778 of 29,894 in Environment terminology (MLC-0121). Request the full dataset.