MLchartDataset catalogue

Stabilization construction completed - other activity

Term · Environment · MLC-T-ENV-026491

1. The event by which the State or the EPA formally notifies the RCRA facility that the interim measures undertaken have been completed to the satisfaction of the Agency; and/or the event by which the State or the EPA formally notifies the RCRA facility that stabilization objectives have been met, but require continued operation and maintenance to maintain this level of performance.

2. A status code of OT should be entered when the primary measure is other activity.

Table 1. Record
IdentifierMLC-T-ENV-026491
FieldEnvironment
SubjectEmergencies
AbbreviationCA650OT
ReferencesRCRA Corrective Action Event Codes
Record as JSON
{
  "id": "MLC-T-ENV-026491",
  "term": "Stabilization construction completed - other activity",
  "field": "Environment",
  "term_source": "Stabilization Construction Completed - Other Activity",
  "definition": "1. The event by which the State or the EPA formally notifies the RCRA facility that the interim measures undertaken have been completed to the satisfaction of the Agency; and/or the event by which the State or the EPA formally notifies the RCRA facility that stabilization objectives have been met, but require continued operation and maintenance to maintain this level of performance.\n\n2. A status code of OT should be entered when the primary measure is other activity.",
  "abbreviation": "CA650OT",
  "subject": "Emergencies",
  "references": [
    "RCRA Corrective Action Event Codes"
  ],
  "url": "https://mlchart.com/terminology/environment/stabilization-construction-completed-other-activity/"
}

Record 25,779 of 29,894 in Environment terminology (MLC-0121). Request the full dataset.