Operator/Owner
Term · Environment · MLC-T-ENV-019705
For the purpose of the 2003 Construction General Permit and in the context of stormwater associated with construction activity, any party associated with a construction project that meets either of the following two criteria: 1.) The party has operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications 2.) The party has day-to-day operational control of those activities at a project which are necessary to ensure compliance with a SWPPP for the site or other permit conditions (e.g., authorized to direct workers at a site to carry out activities required by the SWPPP or comply with other permit conditions).
| Identifier | MLC-T-ENV-019705 |
|---|---|
| Field | Environment |
| Subject | Water |
| References | National Pollutant Discharge Elimination System (NPDES) Glossary |
| See also | Operator; Owner |