MLchartDataset catalogue

Plumming

Term · Industrial and trades · MLC-T-IND-004379

The process of establishing a true vertical line down a mine shaft using one or more weighted wires, known as plumb lines. This surveying technique transfers surface coordinates to the underground workings, providing a reference for aligning tunnels, drifts, and raises. The accuracy of the alignment depends on factors like the depth of the shaft, air currents, and the weight of the plummets used.

Table 1. Record
IdentifierMLC-T-IND-004379
FieldIndustrial and trades
SubjectMining and extraction
TranslationsGerman: Vermessung; Spanish: plomeo; French: plumming
Record as JSON
{
  "id": "MLC-T-IND-004379",
  "term": "Plumming",
  "field": "Industrial and trades",
  "definition": "The process of establishing a true vertical line down a mine shaft using one or more weighted wires, known as plumb lines. This surveying technique transfers surface coordinates to the underground workings, providing a reference for aligning tunnels, drifts, and raises. The accuracy of the alignment depends on factors like the depth of the shaft, air currents, and the weight of the plummets used.",
  "subject": "Mining and extraction",
  "translations": {
    "de": "Vermessung",
    "es": "plomeo",
    "fr": "plumming"
  },
  "url": "https://mlchart.com/terminology/industrial/plumming/"
}

Record 4,787 of 7,361 in Industrial and trades terminology (MLC-0113). Request the full dataset.