MLchartDataset catalogue

Initial setting time

Term · Industrial and trades · MLC-T-IND-003020

The time from first contact between cement and mixing water until the paste has stiffened enough to start losing plasticity, determined with the Vicat needle penetration test. Concrete or mortar must be mixed, placed, and finished before this point. ASTM C150 requires an initial set of at least 45 minutes for Portland cement, while the Indian standard IS 269 sets the minimum at 30 minutes.

Table 1. Record
IdentifierMLC-T-IND-003020
FieldIndustrial and trades
SubjectConstruction
Synonymssetting time
TranslationsGerman: Erstarrungsanfang; Spanish: tiempo de fraguado inicial; French: temps de prise initial
Record as JSON
{
  "id": "MLC-T-IND-003020",
  "term": "Initial setting time",
  "field": "Industrial and trades",
  "definition": "The time from first contact between cement and mixing water until the paste has stiffened enough to start losing plasticity, determined with the Vicat needle penetration test. Concrete or mortar must be mixed, placed, and finished before this point. ASTM C150 requires an initial set of at least 45 minutes for Portland cement, while the Indian standard IS 269 sets the minimum at 30 minutes.",
  "synonyms": [
    "setting time"
  ],
  "subject": "Construction",
  "translations": {
    "de": "Erstarrungsanfang",
    "es": "tiempo de fraguado inicial",
    "fr": "temps de prise initial"
  },
  "url": "https://mlchart.com/terminology/industrial/initial-setting-time/"
}

Record 3,306 of 7,311 in Industrial and trades terminology (MLC-0113). Request the full dataset.