The point at which a cementitious material, such as concrete or mortar, has hardened sufficiently to resist indentation and support light loads, marking the end of its plastic state. This time is determined by standardized tests, such as the Vicat needle test for cement, and indicates when formwork can potentially be removed or subsequent construction activities can begin. It is a longer duration than the initial setting time.

Table 1. Record
IdentifierMLC-T-IND-002263
FieldIndustrial and trades
SubjectConstruction
TranslationsGerman: Erstarrungszeit; Spanish: fraguado final; French: temps de prise finale
Record as JSON
{
  "id": "MLC-T-IND-002263",
  "term": "Final setting time",
  "field": "Industrial and trades",
  "definition": "The point at which a cementitious material, such as concrete or mortar, has hardened sufficiently to resist indentation and support light loads, marking the end of its plastic state. This time is determined by standardized tests, such as the Vicat needle test for cement, and indicates when formwork can potentially be removed or subsequent construction activities can begin. It is a longer duration than the initial setting time.",
  "subject": "Construction",
  "translations": {
    "de": "Erstarrungszeit",
    "es": "fraguado final",
    "fr": "temps de prise finale"
  },
  "url": "https://mlchart.com/terminology/industrial/final-setting-time/"
}

Record 2,498 of 7,361 in Industrial and trades terminology (MLC-0113). Request the full dataset.