Patent · US9644266B2 · B2 · US
Film forming apparatus, gas supply device and film forming method
- (11) Publication number
- US9644266B2
- (21) Application number
- 14/223,582
- (22) Filing date
- 2014-03-24
- (30) Priority date
- 2013-03-29
- (43) Publication date
- 2017-05-09
- (45) Date of grant
- 2017-05-09
- (51) IPC
- B08B 9/032; C23C 16/44; H01J 37/32
- (52) CPC
- C23C Coating metallic material; coating material with metallic material; surface treatment of metallic material by diffusion into the surface, by chemical conversion or substitution; coating by vacuum evaporation, by sputtering, by ion implantation or by chemical vapour deposition, in general: 16/4408, 16/45544
- H01J Electric discharge tubes or discharge lamps: 37/3244, 37/32862
- H10P Generic processes or apparatus for the manufacture or treatment of devices covered by class H10: 14/24, 14/6339, 70/12, 72/0411
- Y10T Technical subjects covered by former us classification: 137/4245
- (73) Assignee
- Tokyo Electron Ltd
- (72) Inventors
- Masayuki Nasu; Masaki Sano; Yu NUNOSHIGE
- (54) Title
- Film forming apparatus, gas supply device and film forming method
- (57) Abstract
There is provided a film forming apparatus including gas supply paths, retaining units, valves, a purge gas supply unit and a control unit. The control unit is configured to implements a film forming process for sequentially performing operations of actuating the valves such that reaction gases are retained in the retaining units, the internal pressures of the retaining units are increased and then the reaction gases are supplied from the retaining units into the process chamber, and a purging process for subsequently repeating, a plurality number of times, operations of actuating the valves such that the purge gas is retained in the retaining units, the internal pressures of the retaining units are increased to a pressure higher than the internal pressures of the retaining units which is increased in the film forming process, and then the purge gas is supplied from the retaining units into the process chamber.
- Full text
- View on Google Patents
Claims (5)
- A film forming apparatus for forming a thin film by sequentially supplying different kinds of mutually-reacting reaction gases to a substrate held within a process chamber of vacuum atmosphere and depositing reaction products on the substrate, the film forming apparatus comprising: gas supply paths formed in a corresponding relationship with the different kinds of the mutually-reacting reaction gases, and configured to supply the mutually-reacting reaction gases into the process chamber; valves installed in the gas supply paths at upstream and downstream sides of retaining units; a purge gas supply unit configured to supply a purge gas to the retaining units; the retaining units installed in the gas supply paths, internal pressures of the retaining units being increased by retaining at least one of the mutually-reacting reaction gases and the purge gas; and a control unit configured to control: a film forming process for sequentially performing operations of actuating the valves such that the mutually-reacting reaction gases are retained in the retaining units, the internal pressures of the retaining units are increased to a first pressure and then the mutually-reacting reaction gases are supplied from the retaining units into the process chamber; and a purging process including a degassing operation of evacuating the gas supply paths to remove the mutually-reacting reaction gases remained from the film forming process, a purging operation including performing a purging gas filling action of simultaneously and continuously supplying the purging gas to the retaining units to increase the internal pressures of the retaining units to a second pressure higher than a first pressure, and subsequently performing and repeating a plurality number of times a purging action of actuating the valves to supply the purging gas from the retaining units sequentially and non-simultaneously to the process chamber, and a vacuum operation, performed after the purging action, of evacuating the gas supply paths to remove the purging gas.
- The apparatus of claim 1, wherein the purge gas supply unit is installed so as to supply the purge gas to the gas supply paths at the upstream side of the retaining units.
- The apparatus of claim 1, further comprising: a cleaning fluid supply unit configured to supply a cleaning fluid into the process chamber, wherein the purge gas is supplied to the retaining units after supplying the cleaning fluid into the process chamber and before supplying the mutually-reacting reaction gases to the retaining units.
- The apparatus of claim 1, wherein the internal pressures of the retaining units generated when the valves existing at the downstream side of the retaining units are closed to increase the internal pressures of the retaining units again by the purge gas after supplying the purge gas into the process chamber from the retaining units whose internal pressures are increased by the purge gas, are set to become 80% to 90% of the internal pressures of the retaining units increased by the purge gas at the time of starting the supply of the purge gas from the retaining units into the process chamber.
- A gas supply device used in a film forming apparatus for forming a thin film by sequentially supplying different kinds of mutually-reacting reaction gases to a substrate held within a process chamber of vacuum atmosphere and depositing reaction products on the substrate, the gas supply device comprising: gas supply paths formed in a corresponding relationship with the different kinds of the mutually-reacting reaction gases, and configured to supply the mutually-reacting reaction gases into the process chamber; valves installed in the gas supply paths at upstream and downstream sides of retaining units; a purge gas supply unit configured to supply a purge gas to the retaining units; the retaining units installed in the gas supply paths, an internal pressures of the retaining units being increased by retaining at least one of the mutually-reacting reaction gases and the purge gas; and a control unit configured to control: a film forming process for sequentially performing operations of actuating the valves such that the mutually-reacting reaction gases are retained in the retaining units, the internal pressures of the retaining units are increased to a first pressure and then the mutually-reacting reaction gases are supplied from the retaining units into the process chamber; and a purging process including a degassing operation of evacuating the gas supply paths to remove the mutually-reacting reaction gases remained from the film forming process, a purging operation including performing a purging gas filling action of simultaneously and continuously supplying the purging gas to the retaining units to increase the internal pressures of the retaining units to a second pressure higher than a first pressure, and subsequently performing and repeating a plurality number of times a purging action of actuating the valves to supply the purging gas from the retaining units sequentially and non-simultaneously to the process chamber, and a vacuum operation, performed after the purging action, of evacuating the gas supply paths to remove the purging gas.
Description
The present disclosure relates to a technical field in which a film is formed on a substrate using a reaction gas.
As a method of forming a film on a substrate, e.g., a semiconductor wafer (hereinafter referred to as a “wafer”), a method called an ALD (Atomic Layer Deposition) method and an MLD (Multi Layer Deposition) method (which will be collectively referred to as an ALD method) are conventionally used. The ALD method may provide a dense thin film and generally used for obtaining a good implantation property. In the ALD method, a specified film is formed by sequentially supplying different kinds of reaction gases reacting with one another to a wafer held within a process chamber.
In general, during a film-forming process, a film is deposited not only on a wafer but also on an inner wall of a process chamber. If the thickness of the deposited film grows larger, it causes the generation of particles. For that reason, a cleaning process is performed after films are formed on a predetermined number of wafers. The cleaning process is carried out by, e.g., supplying a highly-corrosive cleaning gas into the process chamber. The deposits adhering to the inner wall of the process chamber is detached from the inner wall when the deposits are contacted with the cleaning gas. While most of the detached components are removed by evacuating the interior of the process chamber, some of the detached components may sometimes remain within the process chamber.
Citations (67)
- JPH0645256A
- US5453124A
- US6025013A
- US5865205A
- US6228773B1
- US20010016364A1
- US6296711B1
- US20030183171A1
- US6305314B1
- US6451119B2
- KR100375834B1
- US6652655B1
- US6508913B2
- US6540838B2
- US6631334B2
- US20030070617A1
- US20040244837A1
- US20030221779A1
- US7109131B2
- US20060160359A1
- US20040261703A1
- US20060213441A1
- US20090095423A1
- US20090205567A1
- KR20070012465A
- US7615120B2
- US20050223979A1
- US7708859B2
- US20050249876A1
- US20060231204A1
- US20060016559A1
- US8397668B2
- US20060042754A1
- US20090117752A1
- US20060169671A1
- JP2006253629A
- US20060201425A1
- US7674393B2
- US20090269494A1
- US20080248595A1
- US8257602B2
- US20070175391A1
- US20070181255A1
- US20070249173A1
- US20070247075A1
- US20070254486A1
- US20070251918A1
- US20070251917A1
- US20070254483A1
- US20070251642A1
- JP2008091625A
- US20100322604A1
- JP2008277666A
- US20090117746A1
- US20100247763A1
- US20100144145A1
- JP2011192931A
- US20120076935A1
- US20120073672A1
- US8997686B2
- US9348339B2
- US9127358B2
- US20140024223A1
- US20150086715A1
- US20130247651A1
- US20130312663A1
- US20160010210A1