The first shut-in of a drillstem test, which follows the brief initial flow period. With the tester valve closed, pressure recovers toward the initial reservoir pressure, giving a buildup curve from which that pressure can be estimated. It is longer than the initial flow period, and it comes before the main flow period.

Table 1. Record
IdentifierMLC-T-OAG-001984
FieldOil and gas
SubjectWell Testing
Record as JSON
{
  "id": "MLC-T-OAG-001984",
  "term": "Initial shut-in period",
  "field": "Oil and gas",
  "definition": "The first shut-in of a drillstem test, which follows the brief initial flow period. With the tester valve closed, pressure recovers toward the initial reservoir pressure, giving a buildup curve from which that pressure can be estimated. It is longer than the initial flow period, and it comes before the main flow period.",
  "subject": "Well Testing",
  "url": "https://mlchart.com/terminology/oil-and-gas/initial-shut-in-period/"
}

Record 2,127 of 4,469 in Oil and gas terminology (MLC-0103). Request the full dataset.