MLchartDataset catalogue

Nipple down

Term · Oil and gas · MLC-T-OAG-002538

  1. To dismantle and remove the blowout preventer (BOP) stack and other wellhead equipment from the well after drilling operations are complete. This process typically occurs before the completion phase or when moving the rig to a new location. Nipple down procedures must follow strict safety protocols.

  2. To dismantle or remove the blowout preventer (BOP) stack from the wellhead after drilling operations are complete. This procedure is performed to prepare the well for completion or production equipment installation. The BOP stack is typically secured with bolts or clamps that are unfastened during this process.

Table 1. Record
IdentifierMLC-T-OAG-002538
FieldOil and gas
SubjectDrilling; Well Completions
Record as JSON
{
  "id": "MLC-T-OAG-002538",
  "term": "Nipple down",
  "field": "Oil and gas",
  "definitions": [
    "To dismantle and remove the blowout preventer (BOP) stack and other wellhead equipment from the well after drilling operations are complete. This process typically occurs before the completion phase or when moving the rig to a new location. Nipple down procedures must follow strict safety protocols.",
    "To dismantle or remove the blowout preventer (BOP) stack from the wellhead after drilling operations are complete. This procedure is performed to prepare the well for completion or production equipment installation. The BOP stack is typically secured with bolts or clamps that are unfastened during this process."
  ],
  "subject": [
    "Drilling",
    "Well Completions"
  ],
  "url": "https://mlchart.com/terminology/oil-and-gas/nipple-down/"
}

Record 2,708 of 4,469 in Oil and gas terminology (MLC-0103). Request the full dataset.