Blow in
Term · Industrial and trades · MLC-T-IND-000630
The initial operation of starting up a blast furnace after construction or a major reline. This involves carefully introducing raw materials and gradually increasing temperature and pressure to establish stable operating conditions. The blow-in process can take several days to complete before full production rates are achieved.
| Identifier | MLC-T-IND-000630 |
|---|---|
| Field | Industrial and trades |
| Subject | Metallurgy |
| Translations | German: anfahren; Spanish: encender un alto horno; French: allumer un haut fourneau |