MLchartDataset catalogue

Deployment system

Term · Oil and gas · MLC-T-OAG-001004

Equipment and procedure for running a toolstring too long for the lubricator into a live, pressurized well in stages. The string is lowered until a deployment bar sits opposite the BOP slip and pipe rams, which are closed to hold wellbore pressure and support the bar while the lubricator is removed and the next section is made up. Coiled tubing and wireline jobs both use deployment bars for this.

Table 1. Record
IdentifierMLC-T-OAG-001004
FieldOil and gas
SubjectWell Workover and Intervention